GT: Urban Infrastructure and Violence Prevention
一句话结论
这是一个位于危地马拉的港口类海外投资项目,当前阶段为已关闭,批准金额 4500 万美元,批准日期 2017-01-17,由国际多边开发机构提供资金。项目编号 P143495。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 危地马拉(Guatemala)
- 行业
- 港口
- 项目阶段
- 已关闭
- 批准金额
- 45,000,000 美元(约 4500 万美元)
- 批准日期
- 2017-01-17
- 项目编号
- P143495
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Urban Infrastructure and Violence Prevention Project is to increase access to basic urban infrastructure and services and mitigate key risk factors of crime and violence in selected communities. There are three components to the project, the first component being integrated package of small-scale urban infrastructure and violence prevention interventions. This component will finance the identification, preparation and execution of integrated packages of small-scale infrastructure and crime and violence prevention activities. This includes: (a) carrying out of technical assistance, capacity building and community mobilization activities to support the identification and preparation of subprojects in selected communities; (b) carrying out of small-scale infrastructure investments and/or prevention activities (Subprojects) in the territory of the urban or peri-urban (mixto) selected communities. The second component is the Technical Assistance for Capacity Building. This component seeks to strengthen the institutional capacity of Interior Ministry (MINGOB), CIVFSS, the Mancomunidad Gran Ciudad del Sur (MGCS), and participating municipalities (through MGCS). Finally, the third component is the project management, monitoring and evaluation. Component three will provide support to the PIU for project management, coordination and evaluation activities through, inter alia: (a) carrying out project audits; (b) conducting project outreach activities; (c) carrying out mid-term and impact evaluation surveys in order to evaluate the project’s impacts; (d) providing technical support on procurement, safeguards and financial management (FM) requirements, including the hiring of the PIU’s staff; and (e) financing operating costs. The Government is expected to cover the costs of staffing for key positions of the PIU. Finally, while data collection will be undertaken under component two, day to day M&E activities will be financed by component three.
项目编号 P143495 · 入库编号 0a46a8d2d816
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Second Crisis Response and Recovery in Guatemala Development Policy Loan | 2.5 亿美元 | 2022-10-20 |
| Crecer Sano: Guatemala Nutrition and Health Project | 1.0 亿美元 | 2017-03-24 |
同行业其他项目
- Rio Grande do Sul SWAp 2012-05-01
- Khyber Pass Economic Corridor Project 2018-06-14
- Northwestern Road Development Corridor Project 2017-12-14
- Transport Corridors for Economic Resilience (TRACER) 2024-02-20
- Jhelum and Tawi Flood Recovery Project 2015-06-02
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。