中项目网图形标 中项目信息网海内+海外版

Ayeyarwady Integrated River Basin Management Project

国别:缅甸行业:供水 阶段:已关闭 金额:1.0 亿美元 批准:
一句话结论

这是一个位于缅甸的供水类海外投资项目,当前阶段为已关闭,批准金额 1.0 亿美元,批准日期 2014-12-09,由国际多边开发机构提供资金。项目编号 P146482。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
缅甸(Myanmar)
行业
供水
项目阶段
已关闭
批准金额
100,000,000 美元(约 1.0 亿美元)
批准日期
2014-12-09
项目编号
P146482
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objective of the Ayeyarwady Integrated River Basin Management Project for Myanmar is to strengthen integrated, climate resilient management and development of the Ayeyarwady River Basin and national water resources. There are four components to the project, the first component being water resource management institutions, decision support systems and capacity building. This component includes four subcomponents: institutional component, Ayeyarwady River Basin Master Plan and Decision Support System, Preparation of Future Investments (PFI), and implementation support. The second component is the hydro-meteorological observation and information systems modernization. This component includes three subcomponents: institutional and regulatory strengthening, capacity building and implementation support, modernization of observation infrastructure, data management systems and forecasting, and enhancement of Hydromet service delivery systems. The third component is the navigation enhancement on the Ayeyarwady River. This component includes four subcomponents: navigation Improvements, navigation aids, water quality monitoring, and institutional strengthening and implementation support. Finally, the fourth component is the contingent emergency response. This ‘zero component’ (initially without any allocated funding) will allow for the rapid reallocation of funds from other components to provide emergency recovery and reconstruction support in the event of a natural disaster, emergency and/or catastrophic event. Funds potentially reallocated to component four will be disbursed either against a positive list of critical goods and/or against the procurement of works, and consultant services required to support the immediate response and recovery needs of the GoM. A contingent emergency response implementation plan will be developed to guide financial management, procurement, safeguard and any other necessary implementation arrangements and procedures.

项目编号 P146482 · 入库编号 0c722f16a8b3

同国别其他在执行项目

项目名称金额批准日期
Maternal and Child Cash Transfers for Improved Nutrition Project1.0 亿美元2019-09-26

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。