Ayeyarwady Integrated River Basin Management Project
一句话结论
这是一个位于缅甸的供水类海外投资项目,当前阶段为已关闭,批准金额 1.0 亿美元,批准日期 2014-12-09,由国际多边开发机构提供资金。项目编号 P146482。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 缅甸(Myanmar)
- 行业
- 供水
- 项目阶段
- 已关闭
- 批准金额
- 100,000,000 美元(约 1.0 亿美元)
- 批准日期
- 2014-12-09
- 项目编号
- P146482
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Ayeyarwady Integrated River Basin Management Project for Myanmar is to strengthen integrated, climate resilient management and development of the Ayeyarwady River Basin and national water resources. There are four components to the project, the first component being water resource management institutions, decision support systems and capacity building. This component includes four subcomponents: institutional component, Ayeyarwady River Basin Master Plan and Decision Support System, Preparation of Future Investments (PFI), and implementation support. The second component is the hydro-meteorological observation and information systems modernization. This component includes three subcomponents: institutional and regulatory strengthening, capacity building and implementation support, modernization of observation infrastructure, data management systems and forecasting, and enhancement of Hydromet service delivery systems. The third component is the navigation enhancement on the Ayeyarwady River. This component includes four subcomponents: navigation Improvements, navigation aids, water quality monitoring, and institutional strengthening and implementation support. Finally, the fourth component is the contingent emergency response. This ‘zero component’ (initially without any allocated funding) will allow for the rapid reallocation of funds from other components to provide emergency recovery and reconstruction support in the event of a natural disaster, emergency and/or catastrophic event. Funds potentially reallocated to component four will be disbursed either against a positive list of critical goods and/or against the procurement of works, and consultant services required to support the immediate response and recovery needs of the GoM. A contingent emergency response implementation plan will be developed to guide financial management, procurement, safeguard and any other necessary implementation arrangements and procedures.
项目编号 P146482 · 入库编号 0c722f16a8b3
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Maternal and Child Cash Transfers for Improved Nutrition Project | 1.0 亿美元 | 2019-09-26 |
同行业其他项目
- ODRA-VISTULA FLOOD MANAGEMENT PROJECT 2015-07-23
- Disaster Risk Management Development Loan with a CAT DDO 2011-09-13
- Atal Bhujal Yojana (Abhy)-National Groundwater Management Improvement 2018-06-05
- MX DPL Adaptation to Climate Change in the Water Sector 2010-06-10
- Punjab Rural Sustainable Water Supply and Sanitation Project 2021-06-18
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。