中项目网图形标 中项目信息网海内+海外版

Madagascar National Water Project

国别:马达加斯加行业:环境卫生 阶段:在执行 金额:2.2 亿美元 批准:
一句话结论

这是一个位于马达加斯加的环境卫生类海外投资项目,当前阶段为在执行,批准金额 2.2 亿美元,批准日期 2022-05-25,由国际多边开发机构提供资金。项目编号 P174477。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
马达加斯加(Madagascar)
行业
环境卫生
项目阶段
在执行
批准金额
220,000,000 美元(约 2.2 亿美元)
批准日期
2022-05-25
项目编号
P174477
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of National Water Project for Madagascar is to increase access to water services in the Greater Antananarivo area and select secondary towns and to improve the capacity of the water sector. This project has five components. 1) The first component, Improving and securing water production in Greater Antananarivo, has the following sub-components: (i) Increasing and securing the current water production; and (ii) Reducing water leakages. 2) The second component, Improving water supply services in Greater Antananarivo and secondary towns, has the following sub-components: (i) Reinforcement and extension of the water distribution system in Greater Antananarivo and in selected secondary towns; (ii) Improvement of the operational and financial performance of JIRAMA; (iii) Social connection program; and (iv) Promotion of access to water and sanitation services in schools and health centers. 3) The third component, Resilient infrastructure and post-cyclone reconstructions, has the following sub-components: (i) Resilience and reconstruction in National Water and Electricity Utility (JIRAMA) secondary towns; and (ii) Resilience and reconstruction in Ministry of Water, Sanitation and Hygiene (MEAH) secondary towns. 4) The fourth component, Sector Institutional Development, has the following sub-components: (i) Capacity building and strengthening of MEAH and strategic studies; (ii) Project management and Monitoring and Evaluation (M&E) by MEAH; and (iii) Project management, M&E, and implementation of environmental and social standards by JIRAMA. 4) The fourth component, Sector Institutional Development, has the following sub-components: (i) Capacity building and strengthening of MEAH and strategic studies; (ii) Project management and M&E by MEAH; and (iii) Project management, M&E, and implementation of environmental and social standards by JIRAMA. 5) The fifth component, Contingent Emergency Response, will provide immediate response to an eligible crisis or emergency, as needed.

项目编号 P174477 · 入库编号 108509ef27cd

同国别其他在执行项目

项目名称金额批准日期
Second Additional Financing to the Integrated Urban Development and Resilience Project for Greater Antananarivo1500 万美元2024-06-07
Rural Livelihoods Productivity and Resilience Project2.0 亿美元2023-03-30
Digital and Energy Connectivity for Inclusion in Madagascar Project4.0 亿美元2023-03-30
Madagascar Safety Nets and Resilience Project2.5 亿美元2022-12-21
Additional Financing to the Madagascar Road Sector Sustainability Project1.0 亿美元2022-09-27

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。