Guinea Urban Water Project
一句话结论
这是一个位于几内亚的供水类海外投资项目,当前阶段为已关闭,批准金额 3000 万美元,批准日期 2017-06-27,由国际多边开发机构提供资金。项目编号 P157782。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 几内亚(Guinea)
- 行业
- 供水
- 项目阶段
- 已关闭
- 批准金额
- 30,000,000 美元(约 3000 万美元)
- 批准日期
- 2017-06-27
- 项目编号
- P157782
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Urban Water Project for Guinea are to increase access to improved water services in the Greater Conakry area and improve the operational efficiency of the urban water utility. The project components were selected on the basis of (a) the Guinea urban water supply diagnostic study and reinforcement plan, 2013 (ARTELIA) and (b) the urban water supply master plan for Conakry (1996) with further refinements during preparation (including the urban water supply for Conakry options, 国际多边开发机构 2016) and lessons learned from the recent 国际多边开发机构 engagement in the water and sanitation sectors in Conakry. The proposed project will consist of four components. The First component, Urban Water will invest approximately US$26.2 million to increase water production capacity and rehabilitate obsolete parts of the distribution network including targeted extension to improve water service delivery in Conakry in general and the peri-urban poor in particular. The Second component, urban sanitation aims to support the Government with a citywide baseline survey on the current condition of urban sanitation in Greater Conakry, together with the development of a sanitation strategy and master plan for its improvement that would guide interventions in the sector (that is, on-site sanitation, fecal sludge management, and sewerage system). The Third component, institutional strengthening and project management aims to support the water sector institutions and the urban water sector reform and to enable the Project Implementation Unit (PIU) to exercise its responsibilities through the following activities: (i) Water resources management, (ii) Urban water sector reform, and (iii) Project Implementation Unit (PIU). The Fourth component, contingent emergency response is to improve the Government’s response capacity in the event of an emergency, following the procedures governed by OP/BP 10.00 paragraph 13 (Rapid Response to Crisis and Emergencies).
项目编号 P157782 · 入库编号 1c03f5b5a9fd
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Guinea Enhancing Health System Transformation (GUEST) Project | 8500 万美元 | 2024-09-23 |
| Emergency Response and Nafa Program Support Project Additional Financing | 8000 万美元 | 2023-04-26 |
| Guinea Support to Local Governance Project 2 | 8100 万美元 | 2023-03-23 |
| Guinea Natural Resources, Mining and Environmental Management Project | 6500 万美元 | 2021-05-26 |
| Guinea Commercial Agriculture Development Project | 1.0 亿美元 | 2020-09-22 |
同行业其他项目
- Third National Program for Community Empowerment in Rural Areas (PNPM-Rural 2010-03-30
- Accelerating Reforms for an Inclusive and Resilient Recovery DPF 2 2022-03-16
- Accelerating Reforms for an Inclusive and Resilient Recovery DPF 2021-06-10
- Luanda Bita Water Supply Guarantee Project 2019-07-16
- Rural Water Supply and Sanitation Project for Low Income States 2013-12-30
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。