Greater Accra Resilient and Integrated Development Project
一句话结论
这是一个位于加纳的政府类海外投资项目,当前阶段为在执行,批准金额 2.0 亿美元,批准日期 2019-05-29,由国际多边开发机构提供资金。项目编号 P164330。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 加纳(Ghana)
- 行业
- 政府
- 项目阶段
- 在执行
- 批准金额
- 200,000,000 美元(约 2.0 亿美元)
- 批准日期
- 2019-05-29
- 项目编号
- P164330
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Greater Accra Resilient and Integrated Development Project for Ghana is to improve flood risk management and solid waste management in the Odaw River Basin of the Greater Accra Region and improve access to basic infrastructure and services in the targeted communities within the Odaw River Basin. It has five components. First component, Climate Resilient Drainage and Flood Mitigation Measures is led by the Ministry of Works and Housing (MWH) and aims at developing sustainable capacity for flood risk management and mitigating the flood risk for a 10-year flood within the Odaw River Basin. It has two sub-components. (i) Structural measures to mitigate flood impacts in the Odaw River Basin; and (ii) Non-structural measures to improve flood warning and preparedness; Second component, Solid Waste Management Capacity Improvements is led by the Ministry of Sanitation and Water Resources (MSWR) and aims at reducing the amount of solid waste flowing into the primary Odaw channel; It has four sub-component. (i) Community-based solid waste management interventions and community campaign; (ii) Waste transfer stations, materials recovery facility, and center of excellence for solid waste management; (iii) Capping of old dump sites; and (iv) Extending final disposal capacity for the Greater Accra Region; Third component, Participatory Upgrading of Targeted Flood Prone Low-Income Communities and Local Government Support is jointly led by the Ministry of Inner-Cities and Zongo Development (MICZD), Ministry of Local Government and Rural Development (MLGRD) and participating local governments to (a) reduce vulnerability and strengthen climate resilience to flooding and enhance public service provision in priority low-income communities and (b) improve metropolitan planning and coordination, as well as O&M of drainage infrastructure in the Odaw River Basin; It has three sub-component.(i) Participatory community upgrading; (ii) Community engagement and technical advisory services; and (iii) Metropolitan Governance and Operation and Maintenance Improvements; Fourth component, Project Management supports project management activities of the implementing entities and preparatory studies for the subsequent phases of the Series of Projects (SOP); Fifth component, Contingent Emergency Response Component (CERC) will be included in accordance with 国际多边开发机构 Policy on Investment Project Financing. The CERC will enable rapid reallocation of funding between project components following an emergency. By integrating a CERC into this project, the level of disaster preparedness is strengthened, eliminating the need for time-consuming restructuring in the immediate aftermath of a crisis, when the Government is in urgent need of quick liquidity.
项目编号 P164330 · 入库编号 2390b602aebc
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Second Additional Financing to GAMA Sanitation and Water Project | 1.6 亿美元 | 2024-08-08 |
| Ghana Energy Sector Recovery Program | 2.5 亿美元 | 2024-06-12 |
| Ghana Financial Stability Project | 2.5 亿美元 | 2024-05-30 |
| First Resilient Recovery Development Policy Financing | 3.0 亿美元 | 2024-01-23 |
| Ghana Tree Crop Diversification Project | 2.0 亿美元 | 2023-06-23 |
同行业其他项目
- Advancing Uzbekistan's Economic and Social Transformation Development Policy Operation 2022-12-14
- Colombia Territorial Development Development Policy Loan 2016-12-08
- Nigeria: State Action on Business Enabling Reforms (SABER) Program 2022-09-29
- Mexico Strengthening Economic Sustainability DPF 2021-01-21
- Environmental Sustainability and Urban Resilience DPF 2020-12-17
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。