Water Sector Investment Project

国别:阿尔巴尼亚行业:供水 阶段:已关闭 金额:8530 万美元 批准:
一句话结论

这是一个位于阿尔巴尼亚的供水类海外投资项目,当前阶段为已关闭,批准金额 8530 万美元,批准日期 2013-12-20,由国际多边开发机构提供资金。项目编号 P102733。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
阿尔巴尼亚(Albania)
行业
供水
项目阶段
已关闭
批准金额
85,300,000 美元(约 8530 万美元)
批准日期
2013-12-20
项目编号
P102733
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of the Water Sector Investment Project for Albania is to improve the quality of water and wastewater services in the Durres water utility service area; and improve the financial performance of Durres water utility. There are four components to the project. The first component of the project is priority water supply investments. This component will finance: 1) six water supply production wells and a bulk water supply transmission pipeline that will provide up to 630l/s additional supply capacity to address the acute water shortages in the Durres utility service area; 2) ancillary investments, including elevated reservoirs, linking municipalities/communes within the Durres area and along the transmission pipeline route to the water supply system in a sustainable manner; and 3) priority investments in the water distribution network in Durres, as well as provision of leak detection equipment and pressure reducing valves to reduce losses. The second component of the project is wastewater network investments. This component will finance priority wastewater investments aimed at enhancing the existing sewerage network's capacity to handle the increased water supply in an environmentally and socially sustainable manner. The third component of the project is institutional development program, utility strengthening and water demand management. This component will support the Government's broad-based policy and reform agenda at the national level with specific interventions at the local level, focused on the Durres region and its utility on a pilot basis. The fourth component of the project is project implementation support. This component will support implementation of the project including salaries for Project Implementation Unit (PIU) staff, the PIU operating costs, provision of needed equipment, consultant services supporting project investment technical reviews, as well as overall project supervision, monitoring, evaluation and reporting.

项目编号 P102733 · 入库编号 2ab8e6747763

同国别其他在执行项目

项目名称金额批准日期
Clean and Resilient Environment for Blue Sea Project8000 万美元2023-12-01
User-Centred and Inclusive Service Delivery6500 万美元2023-03-16
Climate Resilience and Agriculture Development Project7000 万美元2023-03-16
Building Resilient Bridges5500 万美元2023-03-16
First Resilience and Green Development - DPL1.2 亿美元2023-03-16

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。