CM- Rural Electricity Access Project for Underserved Regions
一句话结论
这是一个位于喀麦隆的能源类海外投资项目,当前阶段为在执行,批准金额 1.5 亿美元,批准日期 2018-12-13,由国际多边开发机构提供资金。项目编号 P163881。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 喀麦隆(Cameroon)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 150,000,000 美元(约 1.5 亿美元)
- 批准日期
- 2018-12-13
- 项目编号
- P163881
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Rural Electricity Access Project for Underserved Regions Project for Cameroon is to increase electricity access in underserved regions of Cameroon. The project comprises of five components. The first component, rural electrification by grid extension consists of two sub-components: (i) rural electrification by extension of medium voltage and low voltage (MV and LV) networks; and (ii) reinforcements and extension of existing High Voltage Level B and High Voltage Level A and Low Voltage Level A (HTB and HTA and BTA) networks to enhance the security of power supply to new villages in far-north regions. The second component, decentralized rural electrification is based on two concepts: (a) a public-private partnership (PPP) concept where the private sector, including energy of Cameroon (ENEO), will play a role as operator and not direct investor, and (b) securing supply of existing isolated mini-grids operated by ENEO in selected localities by hybridization, namely, adding photovoltaic (PV) solar mini-plants and extension of the existing HT and /BTA networks for better service coverage. It consists of two sub-components: (i) development of a pilot PPP for decentralized rural electrification; and (ii) securing the power supply of isolated sites by hybridization. The third component, support to households for connection costs will support the establishment of a revolving fund to help finance initial household connection costs (including ready boards) to obtain grid supply in the 417 localities (targeted under sub-component 1.1 and component 2) and in approximately 12 localities that are already electrified. The fourth component, strengthening institutional capacity of electricity sector and project management will support capacity building of implementing agencies and entities and project management. It consists of six sub-components: (i) strengthening institutional capacity of the electricity sector; (ii) owner’s engineer for project supervision; (iii) structuring: (a) an industrial strategy built on rural electrification activities, and (b) local expertise for engineering, construction, and maintenance of HTA and BTA networks; (iv) income generation and capacity building for women and youth; (v) support to institutional reform of the rural electrification agency (AER); and (vi) project management support. The fifth component, contingent emergency response will be available if needed, to redeploy some of the project resources alongside those of other projects in the Cameroon project portfolio to respond to crisis and emergency needs.
项目编号 P163881 · 入库编号 2f662ea5504c
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Additional Financing for Cameroon Transport Sector Development Project | 5000 万美元 | 2024-06-14 |
| Cameroon Power Sector Reform Program | 3.0 亿美元 | 2023-08-03 |
| Enhancing Connectivity and Resilience in the Far North of Cameroon for Inclusiveness Project | 3.3 亿美元 | 2023-06-20 |
| Local Governance and Resilient Communities Project | 3.0 亿美元 | 2022-09-28 |
| Douala Urban Mobility Project | 4.2 亿美元 | 2022-06-02 |
同行业其他项目
- South Africa Sustainable and Low-Carbon Energy Transition Development Policy Loan 2023-10-24
- Colombia Green and Resilient DPO 2 2024-03-28
- Philippines First Sustainable Recovery DPL 2023-06-13
- Public and Municipal Renewable Energy Project 2023-06-13
- Access to Distributed Electricity and Lighting in Ethiopia (ADELE) 2021-03-29