EC Guayaquil Wastewater Management Project

国别:厄瓜多尔行业:环境卫生 阶段:在执行 金额:1.0 亿美元 批准:
一句话结论

这是一个位于厄瓜多尔的环境卫生类海外投资项目,当前阶段为在执行,批准金额 1.0 亿美元,批准日期 2015-04-22,由国际多边开发机构提供资金。项目编号 P151439。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
厄瓜多尔(Ecuador)
行业
环境卫生
项目阶段
在执行
批准金额
102,500,000 美元(约 1.0 亿美元)
批准日期
2015-04-22
项目编号
P151439
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The project development objective for the Guayaquil Wastewater Management Project for Ecuador is to increase access to improved sanitation services and to reduce wastewater pollution in selected areas of the City of Guayaquil. The proposed Project will benefit over one million residents in the southern districts of Guayaquil and riparian districts of the Estero Salado where sewer mains will be rehabilitated and new household connections will be installed and where poor households will enjoy eased conditions to get connected to the sewer network. This project is organized in four components. Component 1, installation of household connections, will provide support for the increasing of effective access to sewerage collection services within selected areas of the City of Guayaquil, through the installation and rehabilitation of household connections. Component 2, rehabilitation of sewerage network, will finance the rehabilitation of the sewerage network in La Chala basin (Suburbio Oeste area), which is riparian to the Estero Salado estuary. This component of the project aims at reducing infiltrations in the south sewerage subsystem, thus contributing to the reduction of contamination of the Estero Salado estuary from domestic wastewater. Component 3, wastewater treatment and disposal facilities, will treat 100 percent of the domestic wastewater of the southern districts of the City of Guayaquil in order to meet current environmental standards for discharges into the Guayas River. This component will finance the construction of: (i) a new wastewater treatment plant, called, to manage an average flow in dry and wet; (ii) the associated pumping and transmission facilities at Guasmo-H pumping station; (iii) pumping and transmission facilities at La Pradera pre-treatment station, and (iv) the construction of a sludge digester; and (v) the specialized independent supervision of the construction of the facilities described above. Component 4, project management and administration, including communication plan and management of social, environmental, and safety issues will provide support for: (i) activities associated with overall Project management by the Borrower, including those pertaining to the management of social, environmental and safety matters under the Project; (ii) Project-related audits; (iii) monitoring and evaluation activities; (iv) necessary equipment; (v) minor works required for the refurbishment of the PIU’s office; (vi) technical assistance; and (vii) training.

项目编号 P151439 · 入库编号 321d3158c51b

同国别其他在执行项目

项目名称金额批准日期
Ecuador Guayas: Resilient Rural Roads25 万美元2024-09-13
Ecuador Carbon-Conscious Fiscal and Growth Development Policy Financing5.0 亿美元2024-07-31
Ecuador Inclusive and Resilient Housing and Urban Development Project1.0 亿美元2023-10-05
Strengthening the Resilience of Ecuadorian Schools Project1.9 亿美元2023-09-29
Ecuador Third Green and Resilient Recovery DPF (EGARR-DPF3)5.0 亿美元2023-08-04

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。