TZ-Rural Electrification Expansion Program
一句话结论
这是一个位于坦桑尼亚的能源类海外投资项目,当前阶段为在执行,批准金额 2.0 亿美元,批准日期 2016-06-21,由国际多边开发机构提供资金。项目编号 P153781。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 坦桑尼亚(Tanzania)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 200,000,000 美元(约 2.0 亿美元)
- 批准日期
- 2016-06-21
- 项目编号
- P153781
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objectives of Rural Electrification Expansion Project for Tanzania are: (a) to increase access to electricity in rural areas; and (b) to scale-up the supply of renewable energy in rural areas while strengthening sector institutional capacity. The Rural Energy Agency (REA) and the private sector are implementing the National Rural Electrification Program (NREP), the government program, during 2013–2022, as outlined in the Prospectus. The Government of Tanzania (GoT) plans to achieve about 1.3 million connections in rural areas (including public facilities), increasing the average access rate to electricity (both urban and rural) from the current 24 percent to 35 percent by 2022. This Program-for-Results (PforR) aims to support three of the electrification avenues of the NREP identified in the Prospectus: (i) grid extension; (ii) off-grid electrification; and (iii) within the category of offgrid electrification, renewable technologies, including solar photovoltaic (PV). This program is strategically relevant and fully aligned with TDV 2025. This PforR will support the government in implementing the NREP based on these existing plans and will support the targets to be determined in the more detailed Master Plan, as the government adopts and implements it over time. It supports a subset of the NREP, consisting of a time slice of the grid investments outlined in the Prospectus (2016–2022) and the off-grid investments and distributed technologies by the private sector, implemented by the REA. In addition, PforR will support the joint efforts of the GoT and Development Partners (DPs) in strengthening the capacity of the relevant sector institutions. Considering the level of available financing from the DPs, combined with the low level of private sector participation in relation to the investment needs outlined in the Prospectus, public sector financing is crucial for expanding electricity access and improving sector performance in areas that will be connected to the grid at later stages.
项目编号 P153781 · 入库编号 33cf13e7c310
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Financial Access for Sustainable and Transformational (FAST) Growth Project | — | 2024-07-30 |
| Zanzibar Judicial Modernization Project (Zi-JUMP) | — | 2024-05-10 |
| Second Tanzania Intermodal and Rail Development Project | 2.0 亿美元 | 2024-03-28 |
| Public Finance Management and Procurement Systems for Service Delivery Program | 5000 万美元 | 2024-03-21 |
| Project for Advancing Gender Equality in Tanzania (PAMOJA) | 1.0 亿美元 | 2024-03-05 |
同行业其他项目
- South Africa Sustainable and Low-Carbon Energy Transition Development Policy Loan 2023-10-24
- Colombia Green and Resilient DPO 2 2024-03-28
- Philippines First Sustainable Recovery DPL 2023-06-13
- Public and Municipal Renewable Energy Project 2023-06-13
- Access to Distributed Electricity and Lighting in Ethiopia (ADELE) 2021-03-29
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。