BR APL2 Sao Bernardo Integrated Water Management in Sao Paulo Program
一句话结论
这是一个位于巴西的供水类海外投资项目,当前阶段为已关闭,批准金额 2082 万美元,批准日期 2012-03-29,由国际多边开发机构提供资金。项目编号 P125829。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 巴西(Brazil)
- 行业
- 供水
- 项目阶段
- 已关闭
- 批准金额
- 20,820,000 美元(约 2082 万美元)
- 批准日期
- 2012-03-29
- 项目编号
- P125829
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objectives of the Integrated Water Management in Metropolitan Sao Paulo Adjustable Program Loan (APL) Program for Brazil are: (i) to protect and maintain the quality and reliability of Metropolitan Region of Sao Paulo (MRSPs) water resources and potable water sources; (ii) to improve the quality of life of the poor populations residing in key targeted urban river basins in MRSP; and (iii) to improve the institutional capacity and the metropolitan management and coordination in MRSP in water resources management, water pollution control, land-use policy and basic service provision. The project has four components. (1) Institutional capacity building component is designed to support the executing agencies by strengthening their institutional capacity and promoting improved metropolitan management and coordination with regard to the key metropolitan challenges of water resources management, water pollution control, land-use policy and basic service provision. (2) Urban upgrading component is aimed at improving the standards and layouts of urban occupation in the targeted basins and improving the quality of life of the residents of these basins, especially the low-income communities living in informal settlements. (3) Environmental protection and recovery component is designed to protect and recover natural habitats and environmentally sensitive and degraded areas in the sub-basins with a view to improving environmental quality. (4) Integrated water supply and sanitation aims at reversing the main factors contributing to the pollution of the reservoirs and providing integrated water supply and sanitation services to the poor.
项目编号 P125829 · 入库编号 3694148b12f3
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Bahia Sustainable Rural Development Project | 1.0 亿美元 | 2024-11-07 |
| Brazil Proactive, Safe, and Resilient Road Asset Management Program - State of Bahia | 1.5 亿美元 | 2024-09-10 |
| BR Enhancing Prosperity and Sustainability in the State of Sergipe Development Policy Financing | 1.1 亿美元 | 2024-08-27 |
| Brazil: Pernambuco Rural Water and Sanitation Project (PROSAR) | 9000 万美元 | 2024-05-17 |
| Espírito Santo Digital Acceleration Project | 6122 万美元 | 2024-05-17 |
同行业其他项目
- Nigeria Sustainable Urban and Rural Water Supply, Sanitation and Hygiene Program-for-Results 2021-05-25
- Access Governance & Reform for the Electricity and Water Sectors Project 2022-03-31
- Niger Integrated Water Security Platform Project (Niger-IWSP Project) 2021-09-30
- Second National Ganga River Basin Project 2020-06-25
- Yellow River Basin Ecological Protection and Environmental Pollution Control Program 2022-03-31
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。