中项目网图形标 中项目信息网海内+海外版

Center West Regional Development Corridor

国别:哈萨克斯坦行业:道路 阶段:已关闭 金额:9.8 亿美元 批准:
一句话结论

这是一个位于哈萨克斯坦的道路类海外投资项目,当前阶段为已关闭,批准金额 9.8 亿美元,批准日期 2016-06-09,由国际多边开发机构提供资金。项目编号 P153497。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
哈萨克斯坦(Kazakhstan)
行业
道路
项目阶段
已关闭
批准金额
977,860,000 美元(约 9.8 亿美元)
批准日期
2016-06-09
项目编号
P153497
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objectives of the Center West Regional Development Corridor Project are to improve the transport connectivity within the regions along the Kazakhstan Center West Corridor and strengthen the capacity of selected agencies for the effective implementation of the corridor development, and road asset preservation policies. There are five components to the project, the first component being infrastructure development and supervision. The component will be implemented by the CR of the MoID. It will finance civil works on about 1,014 km of road sections between Astana and Shalkar and consulting services for supervision of civil works. The second component is the corridor development. This component is at the core of the MoID strategy to foster regional economic development. The component will be monitored by the relative departments of the MoID with the assistance from the CR, KAZ, local authorities (akimats), and consultants hired under the project. The third component is the operation and maintenance. This component will allow the MoID to implement the sector strategy designed with the assistance of the Bank during the preparation of the road sector reform in 2012–2013. The project will finance facilities and equipment for O&M. The location of facilities is identified by the feasibility study, as well as the type of equipment for routine maintenance. The fourth component is the road safety. The objective of this component is to help the Kazakhstani authorities to develop the RSP, strengthen institutional capacity in relation to the RSP implementation, and increase road safety awareness. Finally, the fifth component is the project management.

项目编号 P153497 · 入库编号 378c23554c6e

同国别其他在执行项目

项目名称金额批准日期
Transport Resilience and Connectivity Enhancement Project (Jezkazgan-Karagandy Section of TCITR (Middle Corridor))3.3 亿美元2024-11-15
Inclusive and Sustainable Economic Growth6.0 亿美元2024-03-14
Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project9243 万美元2024-02-22
Kazakhstan: Fostering Productive Innovation Project8800 万美元2014-12-22
Second Irrigation and Drainage Improvement Project1.0 亿美元2013-06-27

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。