Kiribati Kiritimati Infrastructure Project
一句话结论
这是一个位于基里巴斯的其他类海外投资项目,当前阶段为在执行,批准金额 —,批准日期 2024-12-13,由国际多边开发机构提供资金。项目编号 P506425。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 基里巴斯(Kiribati)
- 行业
- 其他
- 项目阶段
- 在执行
- 批准金额
- —
- 批准日期
- 2024-12-13
- 项目编号
- P506425
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development of the Kiritimati Infrastructure Project in Kiribati aims to improve the safety and climate resilience of Kiritimati’s regional and national connectivity by air and road, and to respond promptly and effectively in case of an eligible crisis or emergency. This project has four components. The first component, Safe and Climate Resilient Regional Connectivity, includes the following sub-components: (i) Technical assistance (TA) under a design and supervision consultancy (DSC) for all design and supervision activities related to the airport and the airport precinct and connection roads; (ii) Civil works, including remediation of the runway, taxiway, and apron, installation of perimeter security fencing, and construction of the airport precinct and connection roads; (iii) Supply and installation of plant and equipment for navigation, communications, safety, and security at the airport; (iv) Development of an airport website with differential access for the public and CXI staff; (v) TA through the DSC for maintenance and operations guidance; and (vi) TA to update the aeronautical information publication (AIP) to reflect the aviation upgrades. The second component, Safe and Climate Resilient Connectivity by Road, includes the following sub-components: (i) TA through the DSC for all necessary design and supervision activities related to the project; (ii) Civil works for the town roads; (iii) TA through the DSC for road maintenance planning and operational guidance; and (iv) Purchase of motorcycle helmets specifically for children to be distributed under arrangements through MLPID. The third component, Project Implementation Support, includes the following sub-components: (i) TA for the Project Coordinating Unit (PCU); (ii) support to engage additional individual national consultants needed by KFSU; (iii) Purchase of up to three project vehicles for use by the PCU, MLPID, and MICT focal points, and KFSU when on Kiritimati; (iv) Renovations to an existing building on the MLPID London site; (v) Incremental Operating Costs (IOC) and training and workshops; and (vi) Support to implement measures to mitigate and respond to project-related cases of sexual exploitation and abuse and sexual harassment (SEA/H), including an SEA/H Action Plan. The fourth component, Contingent Emergency Response Component (CERC), aims to reallocate project funds to support emergency response and reconstruction.
项目编号 P506425 · 入库编号 382764345c3b
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Additional Financing for the Kiribati Outer Islands Transport Infrastructure Investment Project | 1000 万美元 | 2024-04-08 |
| Kiribati First Resilient Growth Development Policy Operation with a Catastrophe Deferred Drawdown Option | 1000 万美元 | 2023-11-30 |
| South Tarawa Sanitation Project | 1949 万美元 | 2022-05-25 |
| Kiribati Digital Government Project | 1200 万美元 | 2022-05-25 |
| Kiribati Outer Islands Resilience and Adaptation Project | 2000 万美元 | 2022-05-13 |