中项目网图形标 中项目信息网海内+海外版

Lilongwe Water and Sanitation Project

国别:马拉维行业:供水 阶段:在执行 金额:1.0 亿美元 批准:
一句话结论

这是一个位于马拉维的供水类海外投资项目,当前阶段为在执行,批准金额 1.0 亿美元,批准日期 2017-12-20,由国际多边开发机构提供资金。项目编号 P163794。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
马拉维(Malawi)
行业
供水
项目阶段
在执行
批准金额
100,000,000 美元(约 1.0 亿美元)
批准日期
2017-12-20
项目编号
P163794
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objective of the Lilongwe Water and Sanitation Project for Malawi is to increase access to improved water services and safely managed sanitation services in Lilongwe City. There are four components to the project, the first component being water distribution network rehabilitation, expansion and NRW reduction. This component involves investments in priority network rehabilitation to remove bottlenecks, increase hydraulic capacity of the existing network and reduce losses, and network expansion to increase coverage. Key investments include: upgrading of 142 km of existing distribution network and creation of pressure zone boundaries; construction of 27 km of transmission mains, eight associated pumping stations and four storage reservoirs with a combined storage of 2,600m3; and performance‐based water loss reduction through improvements in network maintenance, active leakage control, speed and quality of leak repairs and pressure management. The second component is the priority sanitation improvements. This component will finance various investments to increase access to safely managed household and public sanitation services in Lilongwe. These investments include: rehabilitation and expansion of the sewerage network (107 km); installation of 5,000 new sewer connections; rehabilitation and upgrading of the existing Kauma sewage treatment plant; support to construction of 8,000 improved sanitation facilities targeting the poor and vulnerable households; sanitation marketing campaigns; and construction of improved sanitation facilities in 10 markets and 10 schools. The third component is the technical assistance. This component will finance technical assistance (TA) activities designed to support preparation and supervision of all infrastructure investments planned under the project; and to enhance LWB’s capacity to plan future investments under the Lilongwe Water Program. Finally, the fourth component is the institutional capacity strengthening. This component will finance a set of activities designed to: (i) strengthen the capacity of LWB to implement the project and to provide improved water services to its customers; and (ii) strengthen the capacity of LCC to implement the sanitation component of the project, operate and maintain the sanitation infrastructure and support the reforms needed to provide and promote safely managed sanitation services in Lilongwe.

项目编号 P163794 · 入库编号 3a15341b161f

同国别其他在执行项目

项目名称金额批准日期
Digital Malawi Acceleration Project (DMAP)—2024-06-27
Additional Financing for Malawi Governance to Enable Service Delivery3500 万美元2024-06-14
Malawi Health Emergency Preparedness, Response and Resilience Project Using the Multiphase Programmatic Approach—2024-06-13
Malawi Fiscal Governance Program for Results8000 万美元2024-05-23
Malawi First Growth and Resilience DPO with a Catastrophe Deferred Drawdown Option1.4 亿美元2023-12-12

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。