Eastern Dedicated Freight Corridor - I
一句话结论
这是一个位于印度的铁路类海外投资项目,当前阶段为已关闭,批准金额 9.8 亿美元,批准日期 2011-05-31,由国际多边开发机构提供资金。项目编号 P114338。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 印度(India)
- 行业
- 铁路
- 项目阶段
- 已关闭
- 批准金额
- 975,000,000 美元(约 9.8 亿美元)
- 批准日期
- 2011-05-31
- 项目编号
- P114338
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objectives of the Eastern Dedicated Freight Corridor (DFC) Project for India are to (a) provide additional rail transport capacity, improved service quality and higher freight throughput on the 343 km Khurja-Kanpur section of the Eastern rail corridor; and (b) develop the institutional capacity of Dedicated Freight Corridor Corp (DFCCIL) to build and maintain the DFC infrastructure network. There are two components to the project. The first component is design, construction and commissioning of the Khurja-Kanpur section: this component will construct 343 km of double track electrified railway capable of freight train operation with twenty five ton axle loads at 100 km/h; and the second component is institutional development to assist DFCCIL and Ministry of Railways (MOR) to develop their capabilities to best utilize heavy haul freight systems.
项目编号 P114338 · 入库编号 40d80bc3dbe5
同国别其他在执行项目
同行业其他项目
- Eastern Dedicated Freight Corridor - II 2014-04-22
- Buenos Aires – Belgrano Sur Passenger Railway Line Modernization Project 2022-05-31
- Upgrading and Greening the Rio de Janeiro Urban Rail System Additional Financing 2012-01-26
- Resilient and Sustainable Infrastructure for Recovery DPF 2020-09-30
- Railway Improvement and Safety for Egypt Project 2021-03-05
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。