Water Security in the Dry Corridor of Honduras
一句话结论
这是一个位于洪都拉斯的供水类海外投资项目,当前阶段为在执行,批准金额 7000 万美元,批准日期 2020-06-12,由国际多边开发机构提供资金。项目编号 P169901。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 洪都拉斯(Honduras)
- 行业
- 供水
- 项目阶段
- 在执行
- 批准金额
- 70,000,000 美元(约 7000 万美元)
- 批准日期
- 2020-06-12
- 项目编号
- P169901
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Water Security in the Dry Corridor of Honduras Project for Honduras is to improve water service delivery and strengthen water governance in selected areas of the dry corridor of Honduras. The project comprises of four components. The first component, strengthening institutional capacity for water resources governance and management aims to: (a) strengthen the hydrometeorological network, water resources information system (WRIS), and capacity development targeting the Nacaome basin; and (b) develop approaches and mechanisms for more transparent water resources management (WRM) and water governance. It consists of following sub-components: (i) strengthening water resources information systems in the Nacaome water basin; and (ii) promoting water governance and capacity building. The second component, scaling up resilient hydraulic infrastructure for water security in the dry corridor aims to finance implementation of prioritized infrastructure interventions for resilient water management in accordance with good international industry practice (GIIP). It consists of following sub-components: (i) promoting an integrated and multipurpose micro-watershed management approach in the dry corridor; and (ii) maximizing the benefits of the multipurpose Jose Cecilio del Valle (JCV) dam in the Nacaome basin. The third component, project management and capacity building will support: (a) project coordination and management through a project management unit (PMU); (b) monitoring, evaluation, and impact assessment of project activities; (c) project fiduciary administration, internal controls, and audits; (d) systems created by the Honduran strategic investment office (INVEST-H) for environmental and social risk management; (e) stakeholder outreach, a citizen engagement mechanism and a grievance management system; (f) design and implementation of the project’s gender strategy; (g) other project-related strategic studies as well as prefeasibility and basin-wide environmental and social assessments to contribute to preparation of future interventions within the dry corridor, including its transboundary basins; and (h) training of PMU staff. The fourth component, contingency emergency response (CER) will provide immediate response to eligible emergencies. This component will finance emergency activities and expenditures through the reallocation of project funds.
项目编号 P169901 · 入库编号 4805ab80825e
同国别其他在执行项目
同行业其他项目
- Nigeria Sustainable Urban and Rural Water Supply, Sanitation and Hygiene Program-for-Results 2021-05-25
- Access Governance & Reform for the Electricity and Water Sectors Project 2022-03-31
- Niger Integrated Water Security Platform Project (Niger-IWSP Project) 2021-09-30
- Second National Ganga River Basin Project 2020-06-25
- Yellow River Basin Ecological Protection and Environmental Pollution Control Program 2022-03-31
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。