中项目网图形标 中项目信息网海内+海外版

Nghe An Province's Vinh City Priority Infrastructure and Urban Resilience Development Project

国别:越南行业:供水 阶段:在执行 金额:1.3 亿美元 批准:
一句话结论

这是一个位于越南的供水类海外投资项目,当前阶段为在执行,批准金额 1.3 亿美元,批准日期 2023-07-28,由国际多边开发机构提供资金。项目编号 P174157。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
越南(Vietnam)
行业
供水
项目阶段
在执行
批准金额
129,600,000 美元(约 1.3 亿美元)
批准日期
2023-07-28
项目编号
P174157
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of the Nghe An Province’s Vinh City Priority Infrastructure and Urban Resilience Development Project for Vietnam is to reduce flood risk in the core urban area, strengthen capacity for urban resilience management, and support the development of integrated infrastructure in Vinh city. The project comprises of four components. The first component, integrated drainage, environmental sanitation, and connectivity investments will implement the delay and discharge parts of Vinh city’s resilience strategy by expanding and improving the secondary and tertiary combined sewer system in all urban wards, while constructing transport links with improved drainage and wastewater collection capacity. It consists of following sub-components: (i) integrated secondary and tertiary sewer improvement; and (ii) resilient road connectivity improvement. The second component, expansion of water storage capacity will implement the storage part of Vinh city’s resilience strategy. It consists of following sub-components: (i) Hung Hoa 2 regulation lake; and (ii) Hoi Chua drainage pumping station. The third component, river improvements and upgrades will further implement the discharge portion of Vinh city’s resilience strategy by increasing the water discharge capacity into the Vinh River and improving the protective capacity of its riverbank. The fourth component, systems and capacity development will support the development of tools and systems that will enable city officials to better plan and guide the city’s rapid urbanization in a risk-informed and resilient manner and enhance coordination across relevant departments. It consists of following sub-components: (i) integrated flood risk management system development; and (ii) project implementation support.

项目编号 P174157 · 入库编号 5508330cc24c

同国别其他在执行项目

项目名称金额批准日期
Southern Waterway Corridors and Logistics Development Project1.1 亿美元2024-06-21
Binh Duong Province's Water Environment Improvement Project2.3 亿美元2024-01-13
Vietnam University Development of VNU-Hanoi, VNU-HCM, and UD2.9 亿美元2020-06-30
Vinh Long City Urban Development and Enhanced Climate Resilience Project in Vinh Long Province1.3 亿美元2020-06-30
Vietnam Scaling Up Energy Efficiency Guarantee—2019-06-27

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。