District Heating Energy Efficiency Project
一句话结论
这是一个位于乌兹别克斯坦的能源类海外投资项目,当前阶段为在执行,批准金额 1.4 亿美元,批准日期 2018-01-25,由国际多边开发机构提供资金。项目编号 P146206。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 乌兹别克斯坦(Uzbekistan)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 140,000,000 美元(约 1.4 亿美元)
- 批准日期
- 2018-01-25
- 项目编号
- P146206
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the District Heating Energy Efficiency Project for Uzbekistan is to improve the efficiency and quality of heating and hot water services in selected cities within the territory of the Recipient. The project will have two components. First component, modernization of district heating systems will finance energy efficiency investments in modernization of heat production and transportation and distribution systems, including installation of building-level IHS and heat meters for billing purpose, renovation of obsolete boilers and pipes for heat transportation. The project entails a shift to metering and consumption-based billing in the project areas. In addition, gas, electricity, and water supply systems will be upgraded, wherever it is needed for DH purposes. The component will also finance procurement of specialized maintenance equipment for the participating DHCs.There are five sub component, (i) Andijan City; (ii) Bukhara City; (iii) Chirchik City; (iv) Samarkand City and (v) Sergeli District; Second component, implementation support and capacity building will finance capacity-building and implementation support for the MHCS, the Project Coordination Unit (PCU) in the Kommunkhizmat Agency (KA), participating DHCs and their technical support teams. The component will include the following activities: (a) providing technical assistance for Project management, monitoring and supervision, Project financial audit, including Training and Operating Costs; (b) assessment of the profitability of the participating DHCs, develop recommendations to improve their financial performance, and strengthen their capacity, including through workshops for the participating DHCs and other shareholders; (c) development of institutional model for DH sector regulation and management; (d) designing and conducting social surveys of customer satisfaction in the participating cities at midterm and after the project completion with disaggregation by gender; (e) developing and providing support for the implementation of a communication strategy and a public information campaign for the Participating DHCs; (f) preparation of feasibility studies for future investment projects in the DH sector; and (g) other technical assistance (TA) activities identified during project implementation.
项目编号 P146206 · 入库编号 61eec89f5b1e
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Uzbekistan - Khorezm Solar IPP Project | 350 万美元 | 2024-12-16 |
| Second Inclusive and Resilient Market Economy Development Policy Operation | 3.0 亿美元 | 2024-10-03 |
| INnovative SOcial Protection System for inclusiON of Vulnerable People Project | 1.0 亿美元 | 2024-05-24 |
| Uzbekistan Solar and Renewable Energy Storage Project | 1200 万美元 | 2024-01-03 |
| First Inclusive and Resilient Market Economy Development Policy Operation | 8.0 亿美元 | 2023-12-07 |
同行业其他项目
- EG-Giza North Power Project 2010-06-08
- EG - Helwan South Power Project 2013-06-27
- Power System Efficiency and Resilience Project 2020-05-29
- Kenya Private Sector Power Generation Support Project 2012-02-28
- Electric Power Project 2013-09-24
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。