Lebanon Renewable Energy and System Reinforcement Project
一句话结论
这是一个位于黎巴嫩的能源类海外投资项目,当前阶段为在执行,批准金额 2.5 亿美元,批准日期 2024-10-01,由国际多边开发机构提供资金。项目编号 P180501。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 黎巴嫩(Lebanon)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 250,000,000 美元(约 2.5 亿美元)
- 批准日期
- 2024-10-01
- 项目编号
- P180501
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Renewable Energy and System Reinforcement Project for Lebanon is to enable cleaner, more reliable, and efficient grid electricity services in Lebanon. The project comprises of four components. The first component, strengthening of Electricité du Liban (EDL) operational and commercial systems will directly strengthen the ability of EDL to better anticipate, identify, and address network disruptions and strengthen the resilience of EDL’s system. It consists of following sub-components: (i) strengthening of EDL operational systems; and (ii) strengthening of EDL commercial systems. The second component, increase of grid-connected renewable energy supply and network reinforcement will have the following sub-components: (i) development of grid-connected solar photovoltaic (PV) plant; (ii) rehabilitation of Litani River Authority (LRA) hydro power plant (HPPs) and strengthening of dam safety; and (iii) rehabilitation and reinforcement of EDL transmission network. The third component, technical assistance will have the following sub-components: (i) project implementation support and technical studies for EDL; and (ii) project implementation support, technical studies for LRA, and dam safety panel of experts. The fourth component, contingent emergency response component (CERC) will have zero funding allocation at the onset and will only be triggered in emergency circumstances.
项目编号 P180501 · 入库编号 63094dfd918f
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Community-based Wildfire Risk Management in Lebanon’s Vulnerable Landscapes | — | 2024-08-27 |
| Support for Social Recovery Needs of Vulnerable Groups Phase II | 560 万美元 | 2024-08-27 |
| Fiscal Management Project | 2850 万美元 | 2024-02-14 |
| Lebanon: Green Agri-food transformation for economic recovery (GATE) | 2.0 亿美元 | 2023-06-28 |
| Lebanon Emergency Crises and Covid-19 Response Social Safety Net Project Second Additional Financing | 3.0 亿美元 | 2023-05-25 |
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。