Enhancing Energy Security through Power Interconnection and Renewable Energy Program
一句话结论
这是一个位于格鲁吉亚的能源类海外投资项目,当前阶段为在执行,批准金额 3500 万美元,批准日期 2024-05-21,由国际多边开发机构提供资金。项目编号 P179950。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 格鲁吉亚(Georgia)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 35,000,000 美元(约 3500 万美元)
- 批准日期
- 2024-05-21
- 项目编号
- P179950
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Enhancing Energy Security through Power Interconnection and Renewable Energy Program as First Phase of a Multi-Phase Programmatic Approach (MPA) is to enhance the implementation readiness of the Black Sea Submarine Cable (BSSC) Project. There are two components to the project, the first component being black sea seabed surveys. This component would finance (a) the surveys of the Black Sea seabed (seabed surveys), (b) the supervision of the two studies, and (c) capacity building and knowledge transfer to support GSE and the Government of Georgia in designing, procuring, and executing them. The second component is the legal and financial advisory and technical assistance. This component will finance advisory and TA activities to support the preparation of the BSSC Project: Institutional, legal, and financial advisory, Preparatory technical studies for the on-land OHLs connecting the BSSC to Georgia’s domestic high-voltage grid, E&S instruments for the BSSC Project and the on-land OHLs in Georgia and Romania, and Stakeholder engagement and communication support.
项目编号 P179950 · 入库编号 631c17b0bd73
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Georgia Resilient Agriculture, Irrigation, and Land Project | 7500 万美元 | 2023-03-24 |
| Kakheti Connectivity Improvement Project | 1.1 亿美元 | 2022-03-22 |
| Georgia Human Capital Program | 4.0 亿美元 | 2022-03-22 |
| Georgia Relief and Recovery for Micro, Small, and Medium Enterprises | 1.0 亿美元 | 2021-05-11 |
| Log-In Georgia | 4000 万美元 | 2020-08-28 |
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。