中项目网图形标 中项目信息网海内+海外版

Shandong Ecological Afforestation

国别:中国行业:林业 阶段:已关闭 金额:6000 万美元 批准:
一句话结论

这是一个位于中国的林业类海外投资项目,当前阶段为已关闭,批准金额 6000 万美元,批准日期 2010-05-06,由国际多边开发机构提供资金。项目编号 P112759。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
中国(China)
行业
林业
项目阶段
已关闭
批准金额
60,000,000 美元(约 6000 万美元)
批准日期
2010-05-06
项目编号
P112759
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of the Shandong Ecological Afforestation Project for China will be to demonstrate effective afforestation models for environmentally degraded areas in support of Shandong's environmental afforestation programs. There are two components to the project. The first component of the project is environmental plantation establishment. This component will be implemented in 30 selected counties of Shandong province and will include two sub-components: (a) re-vegetation of degraded mountainous areas through planting of tree and shrub vegetation on highly degraded hillsides with a shallow soil cover; and (b) establishing protection forest plantations on saline coastal areas by planting trees and shrubs along roads, canals, and in areas designated for afforetation to protect agricultural land, improve productivity, and stabilize the newly created alluvial land near the mouth of the Yellow River. The second component of the project is technical support and project management. This component will support: (a) upgrading nurseries to propagate wider number of shrub and tree species including improving seedling quality, nursery equipment, onsite irrigation system (sub-lateral or smaller ditches), as well as providing training to small nurseries in nursery management and seedling requirements; (b) applied research, extension, and dissemination programs to generate and disseminate a wider range of species and planting techniques; and (c) strengthening the capacity of project implementing agencies at the provincial and local levels in project management, and monitoring and evaluation through the provision of technical assistance, training, and study tours. The latter will monitor project performance, achievement of project objective, and assess the project's environmental and socio-economic impact.

项目编号 P112759 · 入库编号 65e4d6ad4b10

同国别其他在执行项目

项目名称金额批准日期
Shaanxi Energy Transition and Innovation Demonstration in the Heating Sector3.0 亿美元2024-06-28
Sustainable Fodder Production and Low Methane Livestock Development Program-for-Results2.0 亿美元2024-06-27
Low Carbon Transition of Urban Mobility in Yichang (Hubei)2.5 亿美元2024-05-31
China: Yellow River Basin Ecological Protection and Environmental Pollution Control Program (Gansu and Shandong)3.0 亿美元2024-03-29
Methane-Reducing and Water-Saving Paddy Rice Program for Results (Hunan)2.5 亿美元2023-05-31

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。