AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program
一句话结论
这是一个位于东部与南部非洲的能源类海外投资项目,当前阶段为已关闭,批准金额 6.8 亿美元,批准日期 2012-07-12,由国际多边开发机构提供资金。项目编号 P126579。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 东部与南部非洲(Eastern and Southern Africa)
- 行业
- 能源
- 项目阶段
- 已关闭
- 批准金额
- 684,000,000 美元(约 6.8 亿美元)
- 批准日期
- 2012-07-12
- 项目编号
- P126579
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Regional Eastern Africa Power Pool Project First Adaptable Program Loan (APL1) for Africa is to increase the volume and reduce the cost of electricity supply in Kenya; and to provide revenues to Ethiopia through the export of electricity from Ethiopia to Kenya. There are two components to the project. The first component is construction of a High Voltage Direct Current (HVDC) transmission interconnection between Ethiopia and Kenya. This component includes four sub components: 1) transmission line. This sub-component will finance the construction of about 1,045 km of bipolar 500 kV HVDC overhead transmission line to interconnect the electricity network of Ethiopia, at the Wolayta/Sodo substation, with the Kenya network, at the Suswa substation. 2) The second sub-component is converter substations. This sub-component will finance the engineering design, construction, and commissioning of one converter substation on each end one in Ethiopia and one in Kenya - of the transmission line to be constructed under first component of the project, and provision of goods required for such construction and for the maintenance and surveillance of the transmission network, including an helicopter for each country. 3) Environmental and social management. This subcomponent will implement the environmental and social management plans, as defined in the ESIAs, the resettlement policy framework in Ethiopia, and the RAPs. Financing will be made available by the project implementing entities. 4) System reinforcement. The sub-component includes reinforcements in Kenya of the substations and other parts of the network necessary to integrate regional interconnections, while managing the increased demand in Kenya at the commissioning time of the interconnection for reliable operation of the Kenyan grid. The second component is project management and capacity building. This component includes two sub components. The first sub-component is project management and supervision; and the second sub-component is capacity building and technical assistance.
项目编号 P126579 · 入库编号 71d50ecbe907
同国别其他在执行项目
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- Bangladesh: Rural Electricity Transmission and Distribution Project 2014-02-27
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。