中项目网图形标 中项目信息网海内+海外版

Philippines Third Disaster Risk Management Development Policy Loan

国别:菲律宾行业:政府 阶段:已关闭 金额:5.0 亿美元 批准:
一句话结论

这是一个位于菲律宾的政府类海外投资项目,当前阶段为已关闭,批准金额 5.0 亿美元,批准日期 2020-04-09,由国际多边开发机构提供资金。项目编号 P171440。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
菲律宾(Philippines)
行业
政府
项目阶段
已关闭
批准金额
500,000,000 美元(约 5.0 亿美元)
批准日期
2020-04-09
项目编号
P171440
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The Philippines is highly vulnerable to adverse natural events that creates risk to its recent achievements in poverty reduction and can negatively affect economic growth and debt sustainability. Across its 7,641 islands, the Philippines is exposed to multiple natural hazards including typhoons, earthquakes, flooding, storm surges, tsunamis, volcanic eruptions and landslides. Close to 74 percent of the population is vulnerable to natural disasters and 60 percent of total land area is exposed to multiple hazards. Over the past decade, the 国际多边开发机构 (WB) has actively supported the Government’s Reform Program through a series of lending operation and analytical work. The Bank engagement on Disaster Risk Management (DRM) commenced with a first Disaster Risk Management Development Policy Loan (DPL) with a Catastrophe Deferred Drawdown Option (CAT-DDO) in 2011. This was the first of its kind for the Asia-Pacific region. The operation was accompanied by a comprehensive technical assistance (TA) program that supported the implementation of the Philippine Disaster Risk Reduction and Management Act. The TA contributed to the creation of DRRM offices at the local level and helped build capacity of the Office of Civil Defense (OCD) and key agencies in integrating disaster risk reduction measures, as well as tracking the use of the DRRM funds. The program also supported the Department of Finance (DOF) in developing a National Disaster Risk Financing and Insurance (DRFI) strategy. In 2015, CAT-DDO2 was approved with a dual objective to: (i) strengthen risk reduction investment planning and regulations and; (ii) enhance the financial capacity to manage disaster risk. TA supported its complex reforms focused on developing tools to enhance the socioeconomic resilience of provinces for better planning and investment programming, improving the outdated national building regulations to include disaster risk reduction and climate resilience measures, and strengthening financial preparedness to disasters. The loan was fully drawn down in 2018 following Tropical cyclone Mangkhut.

项目编号 P171440 · 入库编号 7bffb5fd78aa

同国别其他在执行项目

项目名称金额批准日期
Philippines Second Digital Transformation DPL7.5 亿美元2024-11-12
Philippines Digital Infrastructure Project2.9 亿美元2024-10-10
Philippines Second Sustainable Recovery Development Policy Loan7.5 亿美元2024-06-28
Infrastructure for Safer and Resilient Schools5.0 亿美元2024-06-28
Philippines Disaster Risk Management and Climate Development Policy Loan with a Catastrophe Deferred-Drawdown Option5.0 亿美元2023-11-16

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。