中项目网图形标 中项目信息网海内+海外版

Huainan Mining Area Rehabilitation Project

国别:中国行业:供水 阶段:已关闭 金额:1.0 亿美元 批准:
一句话结论

这是一个位于中国的供水类海外投资项目,当前阶段为已关闭,批准金额 1.0 亿美元,批准日期 2015-05-11,由国际多边开发机构提供资金。项目编号 P133000。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
中国(China)
行业
供水
项目阶段
已关闭
批准金额
100,000,000 美元(约 1.0 亿美元)
批准日期
2015-05-11
项目编号
P133000
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The project development objective for the Huainan Mining Area Rehabilitation Project for China is to remediate and create a public space at the JiuDa mining site in Huainan city. The project will have three components. The project components and activities are selected based on detailed environmental site investigations, an environmental and geo-hazard risk assessment, and detailed feasibility studies. Component 1, environmental remediation and water management, will remediate and preserve the overall environment at the former JiuDa mining site through cleaning up, controlling pollution sources, improving the storm water drainage system, vegetation remediation and landscaping. It has three sub-components. Component 2, infrastructure improvement and site utilization, has two sub-components, and will improve the accessibility of the JiuDa mining site (project area/site) and connection between the central district and the new Shannan district with an emphasis on increasing non-motorized transport (including walking and biking). It is also intended to utilize the remediated site and local resources available for community livelihoods development. Component 3, capacity building and technical assistance, will encompass capacity building activities (including domestic and international training and study trips) and provision of technical assistance for, inter alia: (a) project implementation support, including project management, detailed designs, construction supervision, project monitoring, and provision of incremental operating costs for the project; (b) the long-term management and redevelopment of coal mining subsidence areas in Huainan Municipality; and (c) the development of the Shungengshan Scenic Area (SSA) implementation plan.

项目编号 P133000 · 入库编号 7c6f849ce751

同国别其他在执行项目

项目名称金额批准日期
Shaanxi Energy Transition and Innovation Demonstration in the Heating Sector3.0 亿美元2024-06-28
Sustainable Fodder Production and Low Methane Livestock Development Program-for-Results2.0 亿美元2024-06-27
Low Carbon Transition of Urban Mobility in Yichang (Hubei)2.5 亿美元2024-05-31
China: Yellow River Basin Ecological Protection and Environmental Pollution Control Program (Gansu and Shandong)3.0 亿美元2024-03-29
Methane-Reducing and Water-Saving Paddy Rice Program for Results (Hunan)2.5 亿美元2023-05-31

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。