中项目网图形标 中项目信息网海内+海外版

Urban Resilience and Solid Waste Management Project

国别:科特迪瓦行业:废弃物 阶段:在执行 金额:3.1 亿美元 批准:
一句话结论

这是一个位于科特迪瓦的废弃物类海外投资项目,当前阶段为在执行,批准金额 3.1 亿美元,批准日期 2020-06-12,由国际多边开发机构提供资金。项目编号 P168308。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
科特迪瓦(Cote d'Ivoire)
行业
废弃物
项目阶段
在执行
批准金额
315,000,000 美元(约 3.1 亿美元)
批准日期
2020-06-12
项目编号
P168308
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objectives of the Urban Resilience and Solid Waste Management (SWM) Project for Cote d’Ivoire are to reduce vulnerability to flooding in selected urban areas and improve SWM in targeted municipalities. The project comprises of four components. The first component, flood risk mitigation infrastructure and services focus on mitigating the negative impacts of recurrent flooding through a hybrid approach that combines green and grey infrastructures, including urban drainage and associated roadworks, and nature-based solution (NBSs) for erosion control and water retention. It consists of following sub-components: (i) urban drainage and associated roadworks; (ii) nature-based solutions for erosion and landslide control; (iii) emergency preparedness and early warning system; and (iv) resilient urban planning. The second component, improvement of SWM infrastructure and services aims to help further improve the SWM system in the Abidjan Autonomous district, expand the model to other secondary cities, and optimize the systems through better governance, reducing waste quantities buried, and use of digital technology. It consists of following sub-components: (i) strengthening solid waste management capacities in the Abidjan autonomous district and two selected intercommunal groups of secondary cities; (ii) strengthening sector governance, institutional capacity, and citizen engagement; and (iii) improving solid waste management through citizen engagement, recycling, reuse, composting, and digital technology. The third component will support project management activities. The fourth component, contingent emergency response component will allow for rapid reallocation of project funds in the event of a natural or artificial crisis during the implementation of the project.

项目编号 P168308 · 入库编号 828dea058a9e

同国别其他在执行项目

项目名称金额批准日期
Cote d'Ivoire DPO3 Guarantee5.4 亿美元2024-12-05
Cote d'Ivoire Investment for Growth DPF3/PBG/D4D3.1 亿美元2024-12-05
Cote d'Ivoire Water Security and Sanitation Support Program2.5 亿美元2024-05-24
Cote d'Ivoire Second Investment for Growth DPF3.0 亿美元2023-12-08
Côte d'Ivoire Rural Land Tenure Management Strengthening Program2.0 亿美元2023-11-17

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。