AFCC2/RI-Zambezi River Basin Development Project
一句话结论
这是一个位于非洲的供水类海外投资项目,当前阶段为已关闭,批准金额 —,批准日期 2014-05-30,由国际多边开发机构提供资金。项目编号 P133380。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 非洲(Africa)
- 行业
- 供水
- 项目阶段
- 已关闭
- 批准金额
- —
- 批准日期
- 2014-05-30
- 项目编号
- P133380
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the River Basin Development Project for Zambezi is to advance preparation of the Batoka Gorge hydro-electric scheme (HES) and strengthen cooperative development within the Zambezi river basin. The project comprises of five components. The first component, feasibility studies for the Batoka Gorge HES aims to assess, update, and develop a full bankable feasibility study, complete up to tender design, and documentation for the development of Batoka Gorge HES and associated transmission lines to evacuate the power. The second component, environmental and social assessment for the Batoka Gorge HES aims to evaluate the design for the Batoka Gorge HES and develop the required environmental and social impact assessments (ESIAs), along with environmental management plans (EMPs), resettlement policy frameworks (RPFs), and resettlement action plans (RAPs), as needed, for each infrastructure investment associated with the project. The third component, transaction advisory services for the Batoka Gorge HES objective is to provide legal and financial transaction advice to the Zambezi river authority (ZRA) on the development of the Batoka Gorge HES on the Zambezi River. The fourth component, legal and institutional support to the ZRA aims to carry out a program of activities to enhance the legal and institutional framework for the operation and safety of the Kariba hydropower complex, and enhance the recipient's capacity for water resource management and control within the Zambezi river basin. The fifth component, dam break analysis for the Zambezi river basin objective is to support the ZRA enhance the sustainable development and efficient management of the Zambezi river basin through a collaborative exercise with other dam operators in the Zambezi river basin in undertaking a dam break analysis.
项目编号 P133380 · 入库编号 889bb4d7054b
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Additional Financing to Eastern Recovery Project | 5000 万美元 | 2015-12-11 |
| AF - Kandadji Niger Basin Water Resources Program APL2A | 5520 万美元 | 2014-05-22 |
同行业其他项目
- ODRA-VISTULA FLOOD MANAGEMENT PROJECT 2015-07-23
- Disaster Risk Management Development Loan with a CAT DDO 2011-09-13
- Atal Bhujal Yojana (Abhy)-National Groundwater Management Improvement 2018-06-05
- MX DPL Adaptation to Climate Change in the Water Sector 2010-06-10
- Punjab Rural Sustainable Water Supply and Sanitation Project 2021-06-18
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。