Kariba Dam Rehabilitation Project (RI)
一句话结论
这是一个位于东部与南部非洲的供水类海外投资项目,当前阶段为在执行,批准金额 7500 万美元,批准日期 2014-12-09,由国际多边开发机构提供资金。项目编号 P146515。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 东部与南部非洲(Eastern and Southern Africa)
- 行业
- 供水
- 项目阶段
- 在执行
- 批准金额
- 75,000,000 美元(约 7500 万美元)
- 批准日期
- 2014-12-09
- 项目编号
- P146515
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective for the Kariba Dam Rehabilitation Project for Zambia is to assist in improving the safety and reliability of the Kariba Dam. This will be done by supporting the reshaping of the plunge pool, refurbishment of the spillway and enhancing operations to bring them in line with international dam safety standards. The project consists of the following three components: (1) Institutional project support. The objective of this component is to provide the necessary support to assist the Zambezi River Authority in securing the long-term safety and reliability of the Kariba Dam Hydro-Electric Scheme. Activities of this component include: (i) technical services and supervision consultant; (ii) dam break analysis; (iii) panel of experts; (iv) Dispute Adjudication Board; (v) environmental and social assessment; and, (vi) audits, evaluations and other studies. (2) Plunge pool. The objective of this component is to stabilize the plunge pool and prevent further scouring. Activities of this component include: (i) Plunge pool reshaping civil works; (ii) carrying out of additional engineering studies, investigations and surveys, and supply of equipment as might be needed during implementation; (iii) provision of technical services for the monitoring of the plunge pool reshaping; and, (iv) carrying out of visibility and communications activities. (3) Spillway refurbishment. The objective of this component is to improve the operation and prevent potential failure of the spillway control facility. Activities of this component include: (i) Spillway refurbishment contract; and (ii) Additional engineering studies, investigations, surveys and equipment as may be required. Progress toward achieving the project outcomes will be measured against the following: (i) Number of people benefitting in the project area through risk reduction and avoided disaster, and (ii) Emergency Preparedness Plan adopted and operationalized.
项目编号 P146515 · 入库编号 8d5c226807e5
同国别其他在执行项目
同行业其他项目
- ODRA-VISTULA FLOOD MANAGEMENT PROJECT 2015-07-23
- Disaster Risk Management Development Loan with a CAT DDO 2011-09-13
- Atal Bhujal Yojana (Abhy)-National Groundwater Management Improvement 2018-06-05
- MX DPL Adaptation to Climate Change in the Water Sector 2010-06-10
- Punjab Rural Sustainable Water Supply and Sanitation Project 2021-06-18
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。