Renewable Energy Support and Access Accelerator Project
一句话结论
这是一个位于博茨瓦纳的港口类海外投资项目,当前阶段为在执行,批准金额 8800 万美元,批准日期 2024-07-11,由国际多边开发机构提供资金。项目编号 P181221。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 博茨瓦纳(Botswana)
- 行业
- 港口
- 项目阶段
- 在执行
- 批准金额
- 88,000,000 美元(约 8800 万美元)
- 批准日期
- 2024-07-11
- 项目编号
- P181221
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Renewable Energy Support and Access Accelerator Project for Botswana is to enable renewable energy grid integration in Botswana and improve electricity service in selected rural areas. The project comprises of three components. The first component, grid upgrades to enable integration and management of variable renewable energy (VRE) consists of following sub-components: (i) support: the design, supply, installation, commissioning, and operation and maintenance (O and M) of utility-scale battery energy storage systems (BESS) for an estimated capacity and energy of approximately 50MW/200MWh, and the owner’s engineer, who will assist Botswana Power Corporation (BPC) in the supervision of the BESS procurement, construction and commissioning; (ii) installation of static synchronous compensator (STATCOM) at selected substations (planned at Francistown 1, Legothwane, Segoditshane 1, and Ramotswa (132 kV networks)); and (iii) digital upgrades of network control and customer services to enable monitoring of loads and improve operation efficiency, maintenance and planning. The second component, local transmission and distribution (T and D) network upgrades to support rural electrification aims to increase reliability of power supply for existing and future customers in rural villages of Southern districts, by supplying them with reliable domestic power and reducing import of electricity from South Africa. The third component, project management and technical assistance (TA) to support VRE deployment is expected to play a key role in enabling private sector investments and in supporting the utility in this business model transition. It consists of following sub-components: (i) project management; and (ii) VRE deployment.
项目编号 P181221 · 入库编号 b3e2a7684f85
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Emergency Water Security and Efficiency Project | 1.5 亿美元 | 2017-03-02 |
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。