Sustainable Energy Development Project

国别:马绍尔群岛行业:能源 阶段:在执行 金额:3400 万美元 批准:
一句话结论

这是一个位于马绍尔群岛的能源类海外投资项目,当前阶段为在执行,批准金额 3400 万美元,批准日期 2017-12-15,由国际多边开发机构提供资金。项目编号 P160910。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
马绍尔群岛(Marshall Islands)
行业
能源
项目阶段
在执行
批准金额
34,000,000 美元(约 3400 万美元)
批准日期
2017-12-15
项目编号
P160910
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of the Sustainable Energy Development Project for Marshall Islands is to increase the share of renewable energy generation in the Recipient’s territory,and enhance the reliability of electricity supply and improve energy efficiency in the Project Areas. The project has three component. First component, renewable energy investments. This component will include the following two sub-components: (a) Renewable Energy Development in Majuro will finance the design, supply, installation, and operational support for solar power generation, battery energy storage, and grid management equipment in Majuro. The activities to be supported include (i) conducting a detailed survey, preliminary design, cost analysis, preparation of bidding documents, and supervision of engineering, procurement, and construction (EPC) contractor; (ii) installation of an estimated three MW of solar power-generation, inverters, battery storage, grid-connection, and other ancillary equipment needed to support the contribution of renewable energy in RMI’s generation system and reduce diesel generation; and (iii) provision of assistance on operations and maintenance and capacity building activities to enhance knowledge transfer and sustainability of the technology supplied and installed. (b) Supply and Installation of Gensets for Majuro and Ebeye will finance gensets (low/medium or high-speed depending on studies) for MEC’s and KAJUR´s power plants in Majuro and Ebeye to help accommodate the planned grid solar capacity, and to improve fuel efficiency and system reliability; Second component, Promotion of energy efficiency and loss reduction program will provide technical and operational assistance and will complement Component 1 by reducing energy demand through improving the efficiency for both use and supply of electricity from MEC and KAJUR. It will include the following three sub-components: (a) Loss Reduction Program in Ebeye will support design and implementation of a loss reduction program for KAJUR to address issues related to supply-sidemanagement; (b) Demand side energy efficiency; Third component, technical assistance, capacity building and project management enhance the capacity of the Ministry of Finance, Banking and Postal Services (MFBPS), MEC, EPD, KAJUR, and MWSC to support efficient energy sector operation, including: (i) carrying out training and workshops on energy sector policies, regulatory framework, management, and planning; (ii) conducting studies and provision of technical assistance to enhance EPD’s role in the sector; (iii) provision of technical assistance to establish an O&M fund to ensure sufficient funds for the operation and maintenance of the renewable energy investments supplied and installed under Component 1 of the project; and (iv) mainstreaming of gender dimensions into the project.

项目编号 P160910 · 入库编号 babda46ee7d5

同国别其他在执行项目

项目名称金额批准日期
Renewable Energy Generation and Access Increase Project6000 万美元2024-09-24
RMI Enhancing Fiscal Management and Building Disaster and Climate Resilience DPO with a Cat DDO2100 万美元2024-07-19
Additional Financing for the Pacific Resilience Project II under the Pacific Resilience Program1500 万美元2024-05-06
Pacific Islands Regional Oceanscape Program - Second Phase for Economic Resilience1800 万美元2023-05-10
RMI Multisectoral Early Childhood Development Project - II2700 万美元2022-06-06

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。