Improving Lima Traffic Management and Supporting Sustainable Transport Project
一句话结论
这是一个位于秘鲁的交通类海外投资项目,当前阶段为在执行,批准金额 1.5 亿美元,批准日期 2024-10-15,由国际多边开发机构提供资金。项目编号 P178842。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 秘鲁(Peru)
- 行业
- 交通
- 项目阶段
- 在执行
- 批准金额
- 150,000,000 美元(约 1.5 亿美元)
- 批准日期
- 2024-10-15
- 项目编号
- P178842
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Improving Lima Traffic Management and Supporting Sustainable Transport Project using the Multiphase Programmatic Approach (MPA) for Peru is to increase accessibility to job opportunities for the province of Lima population in a green, safe, and inclusive urban mobility system. There are five components to the project, the first component being Traffic lights system. This component focuses on expanding and improving the centralized traffic lights network and strengthening the TCC, including the application of Traffic Signal Priority (TSP). This component includes two subcomponents: : Centralized traffic lights network, and Traffic Control Center. The second component is the Automated traffic violation detection system. This component will implement an automated Traffic Violation Detection and Control Center (TVDCC) and equip the intersections with the highest rates of traffic-related incidents with an electronic traffic violation detection system, prioritizing control of traffic violations that affect safety of NMT and efficient flow of public transport services. The third component is the Safe intersections and neighborhoods. This component will finance the implementation of low-cost, high-impact interventions at intersections with high crash rates and improve safety and public life in selected neighborhoods to promote mode shift to walking and cycling. This component includes two subcomponents: immediate traffic actions plan, and traffic calming zones. The fourth component is the urban mobility, cycle-infrastructure and complete streets. This component will implement bicycle infrastructure as part of comprehensive complete streets interventions to improve travel conditions for pedestrians and cyclists and integrate NMT with public transport, thereby promoting modal shift from motorized modes. Finally, the fifth component is the project management and capacity building. This component includes two subcomponents: technical and administrative project management, and environmental and Social management, and sectoral strategies.
项目编号 P178842 · 入库编号 bca0516e3b7e
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Improving MIDIS’s Information Services within the National Targeting System (SINAFO) at the National Level Project | 5500 万美元 | 2024-08-09 |
| Peru First Fiscal Policy and Sustainable Growth DPF-DDO | 5.0 亿美元 | 2024-08-09 |
| Irrigation for Climate Resilient Agriculture | 1.0 亿美元 | 2023-11-28 |
| Peru: Enabling a Green and Resilient Development DPF - DDO II | 7.5 亿美元 | 2023-10-26 |
| Peru Sustainable Growth and Finance DPF-DDO | 7.5 亿美元 | 2022-12-15 |
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。