Sava and Drina Rivers Corridors Integrated Development Program
一句话结论
这是一个位于Western Balkans的供水类海外投资项目,当前阶段为在执行,批准金额 1.3 亿美元,批准日期 2020-08-06,由国际多边开发机构提供资金。项目编号 P168862。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- Western Balkans(Western Balkans)
- 行业
- 供水
- 项目阶段
- 在执行
- 批准金额
- 133,900,000 美元(约 1.3 亿美元)
- 批准日期
- 2020-08-06
- 项目编号
- P168862
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the First Phase of the Sava and Drina Rivers Corridors Integrated Development Program Project for Bosnia and Herzegovina, Montenegro, and Serbia is to improve flood protection and enhance transboundary water cooperation in the Sava and Drina rivers corridors. The project comprises of four components. The first component, integrated management and development of the Sava river corridor will finance investments in renovation and upgrading of flood protection infrastructures to address the increasing risk of flooding due to climate change. It consists of following sub-components: (i) flood protection and environmental management; (ii) waterway improvements; and (iii) enhancement of ports facilities, services, and logistics. The second component, integrated management and development of the Drina river corridor will support multipurpose investments along the Drina to reduce the risk and potential impact of floods. It consists of following sub-components: (i) flood protection and environmental management; and (ii) integrated development of Drina watershed. The third component, project preparation and management will support: (a) preparation of phase II regional activities, and (b) operational costs, consultancies, non-consultancy services, and goods required for the establishment and operation of the national and entity project implementation units (PIUs). It consists of following sub-components: (i) project preparation; and (ii) institutional strengthening and project management. The fourth component, regional activities is key to strengthening of strategic regional dialogue and joint planning as well as sustainable management and development of the shared water resources in the Sava and Drina river basin, including building resilience to climatic shocks. It consists of following sub-components: (i) regional dialogue, project management, and coordination; and (ii) regional plans, studies, and strategies of basin-wide importance.
项目编号 P168862 · 入库编号 d00c1658d45c
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Western Balkans Trade and Transport Facilitation Phase 2 | 1500 万美元 | 2022-12-23 |
| Western Balkans Trade and Transport Facilitation | 9000 万美元 | 2019-04-18 |
同行业其他项目
- ODRA-VISTULA FLOOD MANAGEMENT PROJECT 2015-07-23
- Disaster Risk Management Development Loan with a CAT DDO 2011-09-13
- Atal Bhujal Yojana (Abhy)-National Groundwater Management Improvement 2018-06-05
- MX DPL Adaptation to Climate Change in the Water Sector 2010-06-10
- Punjab Rural Sustainable Water Supply and Sanitation Project 2021-06-18
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。