Lao PDR Climate Resilient Road Connectivity Improvement Project

国别:老挝行业:道路 阶段:在执行 金额:5600 万美元 批准:
一句话结论

这是一个位于老挝的道路类海外投资项目,当前阶段为在执行,批准金额 5600 万美元,批准日期 2024-09-30,由国际多边开发机构提供资金。项目编号 P179284。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
老挝(Lao People's Democratic Republic)
行业
道路
项目阶段
在执行
批准金额
56,000,000 美元(约 5600 万美元)
批准日期
2024-09-30
项目编号
P179284
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of the Climate Resilient Road Connectivity Improvement Project for Lao People’s Democratic Republic is to improve climate resilient road access in targeted provinces, enhance capacity to manage the road network, and, in case of an eligible crisis or emergency, respond promptly and effectively to it. The project comprises of four components. The first component, climate resilient road access will support: (i) improvement of approximately 300 km of district roads and rural roads in the provinces of Khammouan, Savannakhet, and Saravan to the standards of road design class V/VI as per Ministry of Public Works and Transport (MPWT’s) road design manual, addressing climate and disaster resilience aspects, and maintenance of the Project roads post improvement during the Project period through output and performance-based road contracts (OPBRC) and or hybrid performance-based contracts (Hybrid PBC) and, (ii) construction supervision of the project road improvement works. The second component, project management will support: (i) financial audit, (ii) technical audits of the project road improvement works during construction, (iii) environmental and social monitoring and audits, (iv) road safety audit of the project, road designs at three stages (at design, construction, and completion stages), and awareness campaigns, (v) road user satisfaction surveys carried out at the start of implementation of works, at mid-term, and at the close of the project, (vi) incremental operating costs, (vii) technical and operational assistance for the day-to-day management, monitoring and evaluation of the Project, and (viii) land acquisition, resettlement, and rehabilitation costs, including the implementation of resettlement action plan(s). The third component, institutional development will support MPWT in: (i) capacity building of local contractors in the areas of OPBRCs, climate resilience, road safety, and environmental and social risk management, (ii) a study on climate resilient road network planning and prioritization and capacity building of MPWT and Department of Public Works and Transport (DPWTs), (iii) preparation of a road sector financing strategy, (iv) capacity building of selected MPWT and DPWT staff on cross-cutting issues including road maintenance, OPBRC contract management, road safety, gender, citizen engagement, and climate disaster risk, (v) institutional support for a female internship program, and (vi) preparation of selected environmental, social, technical, and economic documents as well as feasibility studies, through the provision of technical advisory services in the road sector in targeted provinces. The fourth component, contingent emergency response will support MPWT in case of an eligible crisis or emergency in responding promptly and effectively to it as per the contingent emergency response manual.

项目编号 P179284 · 入库编号 d425300dacde

同国别其他在执行项目

项目名称金额批准日期
Lao Health and Nutrition Services Access Project II3900 万美元2024-02-21
Reducing Rural Poverty and Malnutrition Project II (RRPM II)3700 万美元2023-11-30
Community Livelihood Enhancement And Resilience4500 万美元2023-06-15
Power Distribution Improvement Project5100 万美元2023-06-01
Lao PDR Strengthening the National Statistical System2100 万美元2022-12-16

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。