中项目网图形标 中项目信息网海内+海外版

Alat and Karakul Water Supply Project

国别:乌兹别克斯坦行业:供水 阶段:已关闭 金额:8200 万美元 批准:
一句话结论

这是一个位于乌兹别克斯坦的供水类海外投资项目,当前阶段为已关闭,批准金额 8200 万美元,批准日期 2012-12-13,由国际多边开发机构提供资金。项目编号 P118197。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
乌兹别克斯坦(Uzbekistan)
行业
供水
项目阶段
已关闭
批准金额
82,000,000 美元(约 8200 万美元)
批准日期
2012-12-13
项目编号
P118197
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of the Alat and Karakul Water Supply Project for Uzbekistan is to improve the coverage, quality and efficiency of public water supply service in the districts of Alat and Karakul in the Bukhara region. There are four components to the project. The first component is improvement of water supply infrastructure. This component includes some sub-components which states engineering-design and operational technical assistance services to support the project implementing entity and the Project Coordination Unit (PCU) Bukhara branch in the following tasks of project implementation: (a) review of the available feasibility study and preparation of optimized preliminary designs; (b) preparation of detailed designs and bidding documents, construction supervision, and reporting; and (c) improvement utility operation, maintenance and management, all through the provision of goods and consultants' services. The second component is institutional strengthening and capacity building. This component will address Bukhara Regional Vodokanal (BVK) capacity needs to ensure sustainable management, operations and maintenance of water supply service in the Alat and Karakul service areas, following the merger of Alat District Vodokanal (AVK) and Karakul District Vodokanal (KVK) into a new operating division of BVK. By investing in technical assistance, services and goods, the project will upgrade BVK's capacity in terms qualifications of management and operational staff, management and customer service systems and methods, operation and maintenance equipment, and water quality monitoring and laboratory capabilities, as required to operate and maintain large rural water supply systems. The third component is studies for future investments. It includes the preparation of a feasibility study of sewerage and on-site sanitation investments needs in the towns and districts of Alat and Karakul, to accompany the increased provision of water supply services, through the provision of consultants' services. The fourth component is project management. It includes the strengthening the PCU and its Bukhara branch's project management, monitoring and coordination capacity, through the provision of goods, consultants' services, including project financial and technical audits, and training, and financing of incremental operating costs.

项目编号 P118197 · 入库编号 d6201768ecbd

同国别其他在执行项目

项目名称金额批准日期
Uzbekistan - Khorezm Solar IPP Project350 万美元2024-12-16
Second Inclusive and Resilient Market Economy Development Policy Operation3.0 亿美元2024-10-03
INnovative SOcial Protection System for inclusiON of Vulnerable People Project1.0 亿美元2024-05-24
Uzbekistan Solar and Renewable Energy Storage Project1200 万美元2024-01-03
First Inclusive and Resilient Market Economy Development Policy Operation8.0 亿美元2023-12-07

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。