中项目网图形标 中项目信息网海内+海外版

Improving Connectivity and Urban Infrastructure in Cabo Verde

国别:佛得角行业:城市发展 阶段:在执行 金额:4000 万美元 批准:
一句话结论

这是一个位于佛得角的城市发展类海外投资项目,当前阶段为在执行,批准金额 4000 万美元,批准日期 2023-11-21,由国际多边开发机构提供资金。项目编号 P178644。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
佛得角(Cabo Verde)
行业
城市发展
项目阶段
在执行
批准金额
40,000,000 美元(约 4000 万美元)
批准日期
2023-11-21
项目编号
P178644
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of Improving Connectivity and Urban Infrastructure in Cabo Verde Project is to improve access to climate-resilient transport and urban infrastructure for selected project areas in the recipient's territory. This project has five components. 1) The first component, Enhancing Resilient Urban and Community Infrastructure, aims to rehabilitate public spaces and upgrade key public assets to maximize climate change adaptation and low-carbon economic development. 2) The second component, Enhancing Transport Connectivity and Resilience, aims to finance climate-informed rehabilitation and upgrading of inter-city and rural roads, with the objective of ensuring reliable all-season connectivity and access to transport services and reduce transport costs in project areas in Cabo Verde. 3) The third component, Technical Assistance, aims to provide support for capacity building and technical assistance activities for improved, climate resilient low-carbon integrated urban and transport planning, intermodal connectivity, and transport asset management. 4) The fourth component, Project Management, aims to provide support for the management and implementation of the proposed project. 5) The fifth component, Contingent Emergency Response Component (CERC), aims to provide an immediate response to an eligible crisis or emergency, as needed, by financing the implementation of emergency infrastructure rehabilitation and reconstruction.

项目编号 P178644 · 入库编号 e0016b5926c5

同国别其他在执行项目

项目名称金额批准日期
Cabo Verde Second Fiscal Space and Sustainable Growth Development Policy Financing2500 万美元2024-12-12
Cabo Verde Resilient Tourism and Blue Economy Development Second AF3000 万美元2024-04-30
Cabo Verde: First Fiscal Space and Sustainable Growth DPF2500 万美元2023-12-11
Cabo Verde Resilient Tourism and Blue Economy Development AF1000 万美元2023-03-10
Cabo Verde: Second Resilient and Equitable Recovery DPF with a Cat DDO5250 万美元2022-11-17

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。