中项目网图形标 中项目信息网海内+海外版

Indonesia National Slum Upgrading Project

国别:印度尼西亚行业:供水 阶段:已关闭 金额:2.2 亿美元 批准:
一句话结论

这是一个位于印度尼西亚的供水类海外投资项目,当前阶段为已关闭,批准金额 2.2 亿美元,批准日期 2016-07-12,由国际多边开发机构提供资金。项目编号 P154782。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
印度尼西亚(Indonesia)
行业
供水
项目阶段
已关闭
批准金额
216,500,000 美元(约 2.2 亿美元)
批准日期
2016-07-12
项目编号
P154782
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of the National Slum Upgrading Project for Indonesia is to improve access to urban infrastructure and services in targeted slums in Indonesia. The project has five components. The first component, institutional and policy development will support institutional strengthening and capacity building of central government agencies (e.g., BAPPENAS, MPWH)responsible for the management of KOTAKU and will include: (a) institutional analysis at the national level as well as for a sample of municipal governments to identify the nature of support needed to facilitate inter-agency coordination during program/project preparation, implementation and supervision stages; and (b) strategic national upstream policy level studies to facilitate the development of government policy to support the sustainability of slum upgrading and prevention efforts. The second component, integrated planning support and capacity building for Local Governments and Communities will finance the costs of experts and community facilitators throughout the project cycle to support capacity building (including training, workshops, and knowledge exchange events between cities as well as urban districts) of local governments and communities in 154 cities to design and implement slum improvements, including the development of Slum Improvement Action Plans (SIAPs) at the city level and Community Settlement Plans (CSPs) at the community level. The activities under this component will build the capacity of participating local governments to design and implement slum upgrading. The third component, urban infrastructure and services investment support. This component includes two sub-components as summarized below. i) improvement of primary and secondary infrastructure and site development as well as construction of connecting infrastructure as identified in Surat Perintah Pencairan Dana (SIAPs) in 50 selected cities, and ii) support for tertiary infrastructure upgrading in the project cohort of 154 cities based on a CDD approach. The fourth component, implementation support and technical assistance will provide technical support, advisory services and training for Project Management Units (PMUs) at national level, and for Project Implementation Units (PIUs) at national, provincial and city levels. The fifth component, contingency for disaster response due to a high risk of catastrophic natural disasters in Indonesia, this provisional component is made available to finance preparedness and rapid response measures to address disaster, emergency and/or catastrophic events, in accordance with the applicable emergency response operations manual.

项目编号 P154782 · 入库编号 e8f6fd1df003

同国别其他在执行项目

项目名称金额批准日期
Indonesia Supporting Health Transformation Project (I-SeHat)—2024-11-27
Integrated Land Administration and Spatial Planning Project6.5 亿美元2024-09-30
Technical Assistance Grant to Support SINERGIS Implementation—2024-04-22
Labor Market Information and Skills System Transformation for Labor Market Flexibility1.4 亿美元2024-01-18
Indonesia Health Systems Strengthening Project14.8 亿美元2023-12-08

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。