中项目网图形标 中项目信息网海内+海外版

Disaster Risk Management Development Policy Loan with a CAT DDO

国别:巴拿马行业:供水 阶段:已关闭 金额:6600 万美元 批准:
一句话结论

这是一个位于巴拿马的供水类海外投资项目,当前阶段为已关闭,批准金额 6600 万美元,批准日期 2011-10-18,由国际多边开发机构提供资金。项目编号 P122738。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
巴拿马(Panama)
行业
供水
项目阶段
已关闭
批准金额
66,000,000 美元(约 6600 万美元)
批准日期
2011-10-18
项目编号
P122738
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objective of the Disaster Risk Management Development Policy Loan with a Catastrophe Deferred Drawdown Option (CAT DDO) Program is to enhance the Government of Panamas (GoP's) capacity to implement its Disaster Risk Management (DRM) Program for natural disasters. Panama's vulnerability to the impacts of natural hazards is showing an increasing pattern characterized by a higher physical exposure of people, goods, and services, compounded by extreme climatic variability conditions. This evolving risk scenario was manifested in December 2010, when intensive rainfall across Panama caused widespread flooding, even forcing the temporary closing of the Panama Canal due to the unprecedented water levels in the artificial lakes, reaching their highest levels ever recorded. At the same time, extensive areas of Panama City lacked potable water for weeks due to the associated impacts of the rainfall and flooding. According to a March 2011 official government report, Panama needed an additional US$149.3 million to repair damaged infrastructure and restore economic activity in the areas affected by the floods. The (GoP) did not have enough contingent reserves to finance the post disaster rehabilitation phase and was forced to ask the National Assembly for a temporary suspension of the financial limits contained in the Social and Fiscal Responsibility Law to bridge the financial gap caused by the disaster. This Program Document is a US$66 million loan with a CAT DDO as budget financing for the GoP for an initial period of three years. The GoP requested this operation to complement other instruments in the country that are part of its DRM Program, and are in line with the Bank's comprehensive framework for disaster risk management and emphasis on disaster prevention, as opposed to only disaster response.

项目编号 P122738 · 入库编号 ec4db25a9ff0

同国别其他在执行项目

项目名称金额批准日期
Panama Second Climate Resilience and Green Growth DPL3.5 亿美元2024-03-22
Consolidation of the Panama Public Financial Management Information System4000 万美元2023-11-14
Panama Climate Resilience and Green Growth DPL1.5 亿美元2023-04-27
Panama Sustainable Rural Development and Biodiversity Conservation—2022-10-07
Support to Panama PPP Program Development for Recovery Project750 万美元2022-09-29

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。