Bangladesh Second Recovery and Resilience DPC
一句话结论
这是一个位于孟加拉国的韧性类海外投资项目,当前阶段为在执行,批准金额 5.0 亿美元,批准日期 2024-06-21,由国际多边开发机构提供资金。项目编号 P178481。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 孟加拉国(Bangladesh)
- 行业
- 韧性
- 项目阶段
- 在执行
- 批准金额
- 500,000,000 美元(约 5.0 亿美元)
- 批准日期
- 2024-06-21
- 项目编号
- P178481
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objectives of the Second Recovery and Resilience Development Policy Credit Program for Bangladesh are to (i) strengthen fiscal and financial sector policies to sustain growth and (ii) enhance resilience to future shocks, including climate change. The operation is the second in a two-part series. This operation will strengthen the post-pandemic economic recovery while helping Bangladesh prepare for least-developed country (LDC) graduation in 2026, after which the country will gradually have reduced access to concessional financing and preferential export market access. The operation will also strengthen resilience against future shocks, including climate change, by expanding the coverage and efficiency of social protection programs and supporting the transition to a larger share of renewable energy. The R&R DPC series builds on the Jobs DPC series completed in FY2021, which supported the initial COVID-19 response, and complements the concurrent Green and Climate Resilient DPC (GCRD) series. The Program consists of three pillars covering fiscal policies, financial sector reforms, and policies to strengthen resilience to future shocks. The Program draws on extensive advisory and analytical reports to underpin proposed reforms. The selection of prior actions in each reform area reflects measures to support a near-term economic recovery while laying foundations to support a transition to upper middle-income status. Across these three pillars, the Program contributes to the 国际多边开发机构’s mission of ending extreme poverty and boosting shared prosperity on a livable planet. A waiver of the requirement set out in footnote 9 of BP 8.60: Development Policy Financing has been granted for this programmatic series. Footnote 9 of BP 8.60 provides that a programmatic series is considered to have lapsed 24 months after the Executive Directors approve the previous operation in the series. The waiver extends the period that the IDA Board may consider the programmatic series from March 31, 2024, to June 21, 2024, to avoid the series lapsing.
项目编号 P178481 · 入库编号 ec8430b08323
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Chattogram Water Supply Improvement Project | 2.8 亿美元 | 2024-12-19 |
| Health, Nutrition and Population Sector Development Program | 3.8 亿美元 | 2024-12-19 |
| Second Bangladesh Green and Climate Resilient Development Credit | 5.0 亿美元 | 2024-12-19 |
| Bay Terminal Marine Infrastructure Development Project | 6.5 亿美元 | 2024-06-28 |
| Bangladesh Resilient Urban and Territorial Development Project | 4.0 亿美元 | 2024-06-21 |
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。