Regional Emergency Solar Power Intervention Project

国别:西部与中部非洲行业:能源 阶段:在执行 金额:3.1 亿美元 批准:
一句话结论

这是一个位于西部与中部非洲的能源类海外投资项目,当前阶段为在执行,批准金额 3.1 亿美元,批准日期 2022-12-20,由国际多边开发机构提供资金。项目编号 P179267。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
西部与中部非洲(Western and Central Africa)
行业
能源
项目阶段
在执行
批准金额
311,000,000 美元(约 3.1 亿美元)
批准日期
2022-12-20
项目编号
P179267
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of the Regional Emergency Solar Power Intervention Project for Western and Central Africa, Liberia, Sierra Leone, Chad, Togo is to rapidly increase grid-connected renewable energy capacity and strengthen regional integration in the participating countries. The project comprises of four components. The first component, construction of solar photovoltaic (PV), battery energy storage system (BESS) and grid connections will finance all costs associated with the design, supply, and installation (DSI) and operation and maintenance (O and M) for the one to four years of the solar PV power plants and any associated works for grid connection. It consists of following sub-components: (i) construction of 20MWp/16 megawatt, alternating current (MWac) solar PV power plant on Mount Coffee Island in Liberia; (ii) solar PV and battery storage at two locations in Sierra Leone; and (iii) solar PV and battery storage in Chad. The second component, expansion of Mt. Coffee hydro power plant and dam safety enhancement consists of following sub-components: (i) expansion of Mt. Coffee hydro power plant with the installation two new turbines; and (ii) dam safety enhancement for Mount Coffee hydro power plant. The third component, distribution expansion and transmission optimization will finance the expansion of distribution networks and optimization of transmission in Sierra Leone and Togo to help the newly installed capacity to be connected to regional interconnectors and or reach national populations. It consists of following sub-components: (i) supply and installation of voltage regulation equipment at 161/11kV substation of free town to increase the evacuation capacity of the 161kV transmission line and supply and installation of 33 kV and 11 kV distribution lines to optimize the integration of the Newton solar park in Sierra Leone; and (ii) support extension and densification of distribution grid in Togo with climate resilient grid infrastructure. The fourth component, regional coordination, institutional strengthening, and implementation support consists of following sub-components: (i) regional integration and technical assistance (RITA) to West African power pool (WAPP); (ii) regional coordination and institutional strengthening; (iii) implementation support to national project implementation unit (PIUs); and (iv) technical assistance for establishment of river basin management agency and preparation of new hydro projects in Liberia.

项目编号 P179267 · 入库编号 ee9cfcda373f

同国别其他在执行项目

项目名称金额批准日期
Additional Financing for Regional Sahel Pastoralism Support Project II Burkina Faso5000 万美元2024-05-31
Additional Financing to Togo for the Gulf of Guinea Northern Regions Social Cohesion Project2300 万美元2024-05-23
West Africa Coastal Areas Resilience Investment Project AF CI700 万美元2024-05-17
Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2)1.7 亿美元2024-03-22
Accelerating Impacts of CGIAR Climate Research for Africa Additional Financing4000 万美元2024-03-08

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。