中项目网图形标 中项目信息网海内+海外版

CATASTROPHE DEFERRED DRAWDOWN OPTION (DPL with DDO)

国别:斯里兰卡行业:政府 阶段:已关闭 金额:1.0 亿美元 批准:
一句话结论

这是一个位于斯里兰卡的政府类海外投资项目,当前阶段为已关闭,批准金额 1.0 亿美元,批准日期 2014-04-22,由国际多边开发机构提供资金。项目编号 P147454。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
斯里兰卡(Sri Lanka)
行业
政府
项目阶段
已关闭
批准金额
102,000,000 美元(约 1.0 亿美元)
批准日期
2014-04-22
项目编号
P147454
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

This program document proposes a US$102 million Disaster Risk Management, or DRM Development Policy Loan with a Catastrophe Deferred Drawdown Option (CAT-DDO) as budget financing for the Government of Sri Lanka, or GoSL for an initial period of three years. In parallel, a fiscal disaster risk assessment is ongoing5, which will provide a clearer indication of the annual expected loss and probable maximum loss faced by the Government. The development objective of the operation is to enhance the capacity of the GoSL to be more resilient to the impacts of natural disasters. It will achieve this by providing immediate liquidity to the GoSL in the event of a disaster within a policy framework designed to improve the overall capacity of the GoSL to implement its DRM program. The DPL with a CAT-DDO will be delivered in FY14, alongside the US$110 million Improving Climate Resilience Project. The DPL with a CAT-DDO will increase fiscal resilience in the short term through a line of credit to be used in case of a disaster, and associated technical assistance (TA). The Improving Climate Resilience Project will provide support to the GoSL through a first phase of short-term investments to build physical resilience to climate-related hazards. Both operations will be presented to the Board as a holistic package.

项目编号 P147454 · 入库编号 f193e732cc3a

同国别其他在执行项目

项目名称金额批准日期
Sri Lanka Second Resilience, Stability and Economic Turnaround Development Policy Operation4.0 亿美元2024-09-11
Sri Lanka: Primary Healthcare System Enhancing Project (PHSEP)1.5 亿美元2024-06-21
Financial Sector Safety Net Strengthening Project1.5 亿美元2023-11-09
Social Protection Project2.0 亿美元2023-06-28
Inclusive Connectivity and Development Project5.0 亿美元2021-09-30

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。