Sindh Flood Emergency Rehabilitation Project
一句话结论
这是一个位于巴基斯坦的灌溉类海外投资项目,当前阶段为在执行,批准金额 5.0 亿美元,批准日期 2022-12-19,由国际多边开发机构提供资金。项目编号 P179981。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 巴基斯坦(Pakistan)
- 行业
- 灌溉
- 项目阶段
- 在执行
- 批准金额
- 500,000,000 美元(约 5.0 亿美元)
- 批准日期
- 2022-12-19
- 项目编号
- P179981
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objectives of the Sindh Flood Emergency Rehabilitation Project for Pakistan are to: (a) rehabilitate damaged infrastructure and provide short-term livelihood opportunities in selected areas of Sindh province affected by the 2022 floods; and (b) strengthen the Government of Sindh’s capacity to respond to the impacts of climate change and natural hazards. The project comprises of five components. The first component, infrastructure rehabilitation aims to enhance physical resilience through the restoration, rehabilitation, and improvement of critical irrigation and flood protection infrastructure, water supply schemes, roads, and allied infrastructure in flood-affected areas. It consists of following sub-components: (i) rehabilitation of irrigation and flood control infrastructure; (ii) restoration of roads and allied infrastructure; and (iii) restoration of water supply schemes. The second component, livelihoods support will support livelihoods by carrying out of a cash for work program for communities across affected villages with the assistance a of a social mobilization partner (SMP). The third component, institutional strengthening for resilience and technical assistance consists of following sub-components: (i) expansion of Sindh emergency rescue service; (ii) enhancing preparedness capacity for disasters; and (iii) strategic studies for integrated irrigation, drainage, and flood protection. The fourth component, project management and operational costs will provide support for the project implementing units and the operations of the Sindh Irrigation Department (SID) and planning and development department (P and DD), including, inter alia, project management, procurement, contract management, public outreach and dissemination, financial management, technical audits, compliance monitoring of construction activities, oversight of compliance with social and environmental standards, oversight of compliance with social inclusion targets, monitoring and evaluation activities, and grievance redress mechanism. The fifth component, contingent emergency response will provide immediate response to an eligible crisis or emergency, as needed.
项目编号 P179981 · 入库编号 fb2a6071a151
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Second Karachi Water and Sewerage Services Improvement Project (KWSSIP-2) | 2.4 亿美元 | 2024-12-12 |
| Sindh Livestock and Aquaculture Sectors Transformation Project | 1.4 亿美元 | 2024-06-20 |
| Crisis-Resilient Social Protection - Additional Financing | 4.0 亿美元 | 2024-06-20 |
| Getting Results: Access and Delivery of Quality Education Services in Punjab Project | 1.5 亿美元 | 2024-06-14 |
| Second Additional Financing for Dasu Hydropower Stage I Project | 10.0 亿美元 | 2024-06-10 |
同行业其他项目
- Food Systems Resilience Program for Eastern and Southern Africa 2022-06-21
- Nigeria Erosion and Watershed Management Project 2012-05-08
- Transforming Irrigation Management in Nigeria 2014-06-19
- Water Sector Improvement Project 2010-06-03
- Türkiye Water Circularity and Efficiency Improvement Project 2023-05-23
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。