中项目网图形标 中项目信息网海内+海外版

Montenegro Second Institutional Development and Agriculture Strengthening Project

国别:黑山行业:农业 阶段:在执行 金额:3489 万美元 批准:
一句话结论

这是一个位于黑山的农业类海外投资项目,当前阶段为在执行,批准金额 3489 万美元,批准日期 2018-01-30,由国际多边开发机构提供资金。项目编号 P164424。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
黑山(Montenegro)
行业
农业
项目阶段
在执行
批准金额
34,890,000 美元(约 3489 万美元)
批准日期
2018-01-30
项目编号
P164424
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of Second Institutional Development and Agricultural Strengthening Project for Montenegro is to improve the competitiveness of agriculture and fisheries in Montenegro through enhanced delivery of government support in alignment with EU accession requirements. This project has four components as follows. 1) The first component, Strengthening Ministry of Agriculture and Rural Development (MARD) agriculture, rural development and fisheries program, aims to (a) increase and diversify income generation opportunities for productive units, contribute to the creation of jobs, as well as improve resilience of productive units for adaptation to climatic pressures, and (b) support Montenegro for meeting Chapter 11 closing benchmarks. It has the following subcomponents: (i) Increasing and diversifying income opportunities through grants for agriculture, rural development and fisheries; and (ii) Strengthening the MARD toward fulfilling EU accession requirements. 2) The second component, Support for the Food Safety, Veterinary and Phytosanitary Services, aims to develop capacity for food safety, veterinary and phytosanitary services as part of the creation of an integrated food quality system which is consistent with European Union (EU) requirements. It has the following subcomponents: (i) Safe management of animal by-products; (ii) Strengthening the diagnostic capacity of the phytosanitary laboratory; and (iii) Support to inspection services. 3) The third component, Modernization of the Fisheries Sector, aims to finance public sector investment aimed at achieving two objectives: (i) enhancing the productive capacity of the sector with investments in basic infrastructure and equipment that will provide fishermen with regulated safe, and sanitary landing facilities and access to port, and (ii) strengthening the institutional capacity to apply the CFP upon EU accession, as well as substantially strengthen administrative, inspection, and control capacity. It has the following two subcomponents: (i) Development of a network of landing sites (both in ports and other locations) with enhanced access to auxiliary services; and (ii) Capacity Building for the Directorate for Fisheries, and support to Associations of Fishermen. 4) The fourth component, Project Management, aims to cover the costs for project management related to staffing, consultancies, and equipment costs, as well as implementation of the Environmental and Social Management Framework (ESMF), monitoring and evaluation of all project activities in line with the Results Framework, adequate fiduciary (procurement and financial management), audits and accountability mechanisms for oversight, including a grievance redress mechanism.

项目编号 P164424 · 入库编号 fbc660a8fdb7

同国别其他在执行项目

项目名称金额批准日期
Montenegro Energy Sector Decarbonization Project2020 万美元2024-12-04
Montenegro First Resilient Fiscal and Sustainable Development DPF8660 万美元2024-10-04
Additional Financing for the Montenegro Revenue Administration Reform Project520 万美元2019-10-10
Montenegro Second Energy Efficiency Project739 万美元2018-06-04
Revenue Administration Reform Project1570 万美元2017-07-31

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。