Alma Transmission Project

国别:哈萨克斯坦行业:能源 阶段:已关闭 金额:7800 万美元 批准:
一句话结论

这是一个位于哈萨克斯坦的能源类海外投资项目,当前阶段为已关闭,批准金额 7800 万美元,批准日期 2010-11-16,由国际多边开发机构提供资金。项目编号 P116919。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
哈萨克斯坦(Kazakhstan)
行业
能源
项目阶段
已关闭
批准金额
78,000,000 美元(约 7800 万美元)
批准日期
2010-11-16
项目编号
P116919
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The objective of the Alma Electricity Transmission Project for Kazakhstan is to improve the reliability and quality of electricity supply to consumers in the Almaty region in an environmentally responsible and financially sustainable manner. There are three components to the project: (1) construction of transmission lines provision of goods and works for: (a) construction of a 500 kV overhead transmission line (OHTL) from Alma substation to Almaty substation; (b) construction of a 220 kV OHTL from Alma substation to Kensai substation; (c) construction of incoming cross connection lines of the 220 kV OHTL from Almaty CHP-3 (combined heat and power) to Shelek substation for connection with Alma substation; (d) construction of the incoming cross connection lines of the 220 kV OHTL from Almaty CHP-3 to Robot substation for connection with Alma substation; and (e) construction of a 500 kV OHTL from Alma substation to YuKGRES substation; (2) construction, extension, and modernization of substations provision of goods and works for: (a) construction of a new 500 kV Alma substation and extension and modernization of the 500 kV Almaty substation; and (b) extension and modernization of YuKGRES substation; and (3) consulting and technical services provision of: (a) consultants' services for procurement and Project management, including preparation of bidding documents and technical specifications, site visits, quality control and monitoring of all executed work, and verification of contractor's payments and reporting; and (b) technical services for the selection and approval of the overhead transmission line route including support for selection of the transmission routes, conduct of engineering surveys and engineering supervision of the turn-key contracts during construction.

项目编号 P116919 · 入库编号 01dcbff08294

同国别其他在执行项目

项目名称金额批准日期
Transport Resilience and Connectivity Enhancement Project (Jezkazgan-Karagandy Section of TCITR (Middle Corridor))3.3 亿美元2024-11-15
Inclusive and Sustainable Economic Growth6.0 亿美元2024-03-14
Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project9243 万美元2024-02-22
Kazakhstan: Fostering Productive Innovation Project8800 万美元2014-12-22
Second Irrigation and Drainage Improvement Project1.0 亿美元2013-06-27

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。