中项目网图形标 中项目信息网海内+海外版

Project for Integrated Urban and Tourism Development (PIUTD)

国别:阿尔巴尼亚行业:废弃物 阶段:在执行 金额:7100 万美元 批准:
一句话结论

这是一个位于阿尔巴尼亚的废弃物类海外投资项目,当前阶段为在执行,批准金额 7100 万美元,批准日期 2016-11-15,由国际多边开发机构提供资金。项目编号 P155875。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
阿尔巴尼亚(Albania)
行业
废弃物
项目阶段
在执行
批准金额
71,000,000 美元(约 7100 万美元)
批准日期
2016-11-15
项目编号
P155875
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of the Integrated Urban and Tourism Development Project for Albania is to improve urban infrastructure, enhance tourism assets, and strengthen institutional capacity to support tourism-related local economic development in selected areas in the south of Albania. The project comprises of four components. The first component, urban upgrading and infrastructure improvement will finance the upgrading of infrastructure in selected municipalities by: (a) preparing of feasibility studies and designs (including urban design studies); (b) carrying out construction works to restore selected heritage buildings; (c) upgrading public spaces, the street network, and associated infrastructure; and (d) conducting construction supervision. The second component, touristic sites upgrading will finance investments aimed at improving selected touristic sites along the south of the Albania touristic corridor by inter alia: (a) restoring of selected heritage and cultural assets and creating rest stops or viewpoints; (b) repairing and improving site infrastructure such as pedestrian’s pathways; (c) preparing the required feasibility studies, site management plans, engineering designs; and (d) conducting construction supervision. The third component, tourism market and product development will: (a) strengthening the capacity of municipalities to deliver municipal services through inter alia: (i) provision of asset management systems, geographic information systems, and solid waste collection equipment; and (ii) establishment of site management capacity to enhance the operation of rehabilitated assets. The fourth component, implementation support will provide support to carry out project implementation, including maintenance of the project monitoring and evaluation system, as well as training and financing of incremental operating costs.

项目编号 P155875 · 入库编号 08a0cde53e6b

同国别其他在执行项目

项目名称金额批准日期
Clean and Resilient Environment for Blue Sea Project8000 万美元2023-12-01
User-Centred and Inclusive Service Delivery6500 万美元2023-03-16
Climate Resilience and Agriculture Development Project7000 万美元2023-03-16
Building Resilient Bridges5500 万美元2023-03-16
First Resilience and Green Development - DPL1.2 亿美元2023-03-16

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。