Accelerating Transport and Trade Connectivity in Eastern South Asia – Nepal Phase 1 Project
一句话结论
这是一个位于尼泊尔的道路类海外投资项目,当前阶段为在执行,批准金额 2.8 亿美元,批准日期 2022-06-28,由国际多边开发机构提供资金。项目编号 P177902。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 尼泊尔(Nepal)
- 行业
- 道路
- 项目阶段
- 在执行
- 批准金额
- 275,000,000 美元(约 2.8 亿美元)
- 批准日期
- 2022-06-28
- 项目编号
- P177902
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of First Phase of the Accelerating Transport and Trade Connectivity in Eastern South Asia Project is to increase the efficiency and resilience of trade and transport along selected corridors in Nepal. This project has four components. 1) The first component, Digital Systems for Trade, has the following sub-components: (i) Design, supply, development, installation, configuration, and testing of an electronic automated border management system, including an electronic cargo tracking system; (ii) – Design, supply, development, installation, configuration, and testing of a business intelligence and data analytics system and risk engine; (iii) Deployment of intelligence systems related to data networks, closed-circuit television (CCTV) systems, and other monitoring systems, through the upgrading of hardware and software systems; and (iv) Design, supply, development, installation, configuration, and testing of a web-based supply management information system for the automation of registration processes and permits. 2) The second component, Green and Resilient Transport and Trade Infrastructure, has the following sub-components: (i) Upgrading works and construction supervision for the Butwal-Gorusinghe-Chanauta (BGC) road section; (ii) Detailed design, construction, and construction supervision of a green resilient urban bridge, including the construction of a green climate-resilient four-lane bridge; (iii) Development and implementation of a green resilient highway corridor concept and strategy to support the development, approval, and implementation of an integrated strategy. 3) The third component, Institutional and Policy Strengthening for Transport and Trade, has the following sub-components: (i) Providing technical assistance to advance Nepal’s preparedness and subsequent implementation of the Motor Vehicle Agreement (MVA); (ii) Supporting customs reforms; (iii) – Supporting implementation of private sector support initiatives; (iv) Supporting training, consultants’ recruitment, and capacity strengthening activities for the Implementing Agencies (IAs), other relevant agencies at the central, provincial, and local levels, and the private sector, on critical issues; and (v) Providing support for the preparation of future projects through relevant preparatory studies. 4) The fourth component, Contingency Emergency Response (CERC), will provide support for an immediate response to an eligible crisis or emergency, as needed.
项目编号 P177902 · 入库编号 0a5f4f10ca12
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| NEPAL SECOND GREEN, RESILIENT, AND INCLUSIVE PROGRAMMATIC DEVELOPMENT POLICY CREDIT | 1.0 亿美元 | 2024-12-12 |
| Nepal Disaster Resilience Development Policy Credit with Cat DDO (NDRC) | 1.5 亿美元 | 2024-10-08 |
| Nepal Finance for Growth DPC (3 of 3) | 8000 万美元 | 2024-05-06 |
| Second Fiscal Policy for Growth, Recovery and Resilience Development Policy Credit | 1.0 亿美元 | 2024-02-29 |
| Provincial and Local Roads Improvement Program - Phase 1 | 1.0 亿美元 | 2024-02-29 |
同行业其他项目
- PMGSY Rural Roads Project 2010-12-20
- Bangladesh Padma Multipurpose Bridge Project 2011-02-24
- East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Corridor (CAREC - 1b) 2012-05-01
- Center West Regional Development Corridor 2016-06-09
- Horn of Africa Gateway Development Project 2020-09-08
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。