Indonesia Power Transmission Development Project
一句话结论
这是一个位于印度尼西亚的能源类海外投资项目,当前阶段为已关闭,批准金额 2.2 亿美元,批准日期 2010-07-08,由国际多边开发机构提供资金。项目编号 P117323。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 印度尼西亚(Indonesia)
- 行业
- 能源
- 项目阶段
- 已关闭
- 批准金额
- 225,000,000 美元(约 2.2 亿美元)
- 批准日期
- 2010-07-08
- 项目编号
- P117323
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Power Transmission Development Project for Indonesia is to assist the Borrower to meet growing electricity demand and improve the reliability of electricity supply in Java and south-central Sumatra by strengthening the dower transmission system. There are two components to the project, the first component being Java-Bali transmission substation expansion and construction. This component includes: expansion of four existing 500/150 kV and twenty to twenty-five existing 150/20 kV substations through the installation of new transformers and associated equipment; and construction of one new 150/20 kV substation, including two 60 MVA transformers, and installation of associated equipment. Finally, the second component is the South-Central Sumatra transmission substation upgrading and expansion. This component includes: upgrading of five (5) existing 150 kV substations through the installation of new transformers and associated equipment; and expansion of ten (10) to fifteen (15) existing 150/20 kV substations through the transformers and associated equipment.
项目编号 P117323 · 入库编号 1313203707dd
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Indonesia Supporting Health Transformation Project (I-SeHat) | — | 2024-11-27 |
| Integrated Land Administration and Spatial Planning Project | 6.5 亿美元 | 2024-09-30 |
| Technical Assistance Grant to Support SINERGIS Implementation | — | 2024-04-22 |
| Labor Market Information and Skills System Transformation for Labor Market Flexibility | 1.4 亿美元 | 2024-01-18 |
| Indonesia Health Systems Strengthening Project | 14.8 亿美元 | 2023-12-08 |
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。