中项目网图形标 中项目信息网海内+海外版

Vietnam Managing Natural Hazards Project

国别:越南行业:供水 阶段:已关闭 金额:1.5 亿美元 批准:
一句话结论

这是一个位于越南的供水类海外投资项目,当前阶段为已关闭,批准金额 1.5 亿美元,批准日期 2012-07-26,由国际多边开发机构提供资金。项目编号 P118783。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
越南(Vietnam)
行业
供水
项目阶段
已关闭
批准金额
150,000,000 美元(约 1.5 亿美元)
批准日期
2012-07-26
项目编号
P118783
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of the Managing Natural Hazards Project for Vietnam is to increase the resilience of the people and economic assets to natural hazards in selected river basins of the project provinces within the overall framework of Vietnam's national disaster prevention, response and mitigation strategy towards 2020. There are five components to the project. The first component is strengthening Disaster Risk Management (DRM) institutions, information systems and planning. This component includes (i) facilitation of inter-ministerial coordination, policy dialogue and knowledge-sharing mechanisms; (ii) establishment of provincial disaster management centers in project provinces where such centers are needed; and (iii) provision of technical assistance for government agencies at different levels. Improving the capacity, harmonization, coordination and sharing of DRM databases and information, including: (i) harmonizing and integrating existing DRM databases and information systems; (ii) development of an inventory of existing medium and small scale reservoirs in project provinces, their safety standards, safety guidelines, and operational procedures; (iii) development of software for the management of reservoirs to be used at national and provincial levels; and (iv) provision of technical assistance on the use of the databases and software and the implementation of safety guidelines. The second component is strengthening weather forecasting and early warning systems. This component includes technical assistance for development and implementation of an integrated national hydromet forecasting and early warning systems and end-to-end applications: provision of technical assistance for the design and implementation of a nation-wide integrated system. The third component is community-based disaster risk management. This component includes strengthening the capacity of participating commune-level stakeholders and agencies in planning and engaging in a broad range of risk reduction measures, including provision of support for: (i) improving commune-level flood and storm risks management procedures; (ii) capacity building for commune-based institution leaders; (iii) the development of inter-communal support platforms; (iv) development of community resilient planning; and (v) enhancement of private sector commune partnerships. The fourth component is Priority disaster risk mitigation investments. The component will support identification, prioritization, and implementation of major DRM investments within the four selected river basins to mitigate risks posed by natural hazards. The fifth component is project management, monitoring and evaluation.

项目编号 P118783 · 入库编号 159d22a3aa18

同国别其他在执行项目

项目名称金额批准日期
Southern Waterway Corridors and Logistics Development Project1.1 亿美元2024-06-21
Binh Duong Province's Water Environment Improvement Project2.3 亿美元2024-01-13
Nghe An Province's Vinh City Priority Infrastructure and Urban Resilience Development Project1.3 亿美元2023-07-28
Vietnam University Development of VNU-Hanoi, VNU-HCM, and UD2.9 亿美元2020-06-30
Vinh Long City Urban Development and Enhanced Climate Resilience Project in Vinh Long Province1.3 亿美元2020-06-30

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。