Irrigation Development Project
一句话结论
这是一个位于波黑的灌溉类海外投资项目,当前阶段为已关闭,批准金额 4000 万美元,批准日期 2012-05-03,由国际多边开发机构提供资金。项目编号 P115954。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 波黑(Bosnia and Herzegovina)
- 行业
- 灌溉
- 项目阶段
- 已关闭
- 批准金额
- 40,000,000 美元(约 4000 万美元)
- 批准日期
- 2012-05-03
- 项目编号
- P115954
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Irrigation Development Project for Bosnia and Herzegovina is to improve the performance of the irrigation systems and the irrigation institutions to support agricultural producers in the project areas. There are three components to the project. The first component is infrastructure investment. This component will finance the implementation of irrigation and drainage infrastructure rehabilitation of about 12 Subprojects (SPs), of which 6 each located in Republika Srpska (RS) and Federation of Bosnia-Herzegovina (FBiH). The SPs are selected from the long-lists of potential sub-projects that were prepared by the two ministries. In FBiH this was based notably on proposals submitted by the cantons. The SPs are all located in existing agricultural land that in the past has been supplied with irrigation. In some of the SPs, the first priority will be on restoring or improving drainage. The main activities include rehabilitation with some construction, reconstruction, upgrading and modernization (only for the public/main and semi-public/secondary parts of the irrigation system, hence not on-farm), and also the introduction of new technologies that promote water use efficiency such as drip irrigation and low-pressure sprinklers. The second component is irrigation modernization. This component will support the capacity strengthening of the Ministries and Water Agencies in RS and FBiH, and participating municipalities and cantons in addressing: the new sector policies, and establishing and strengthening Water User Associations (WUAs). It will assist in developing Operations and Maintenance (O and M) arrangements for the introduced infrastructure/facilities, the fee determination, fee collection and management, and related water resources and irrigation management. The third component is project implementation support. This will cover costs of project management including Monitoring and Evaluation (M and E), safeguards, audits, Management Information System (MIS), the baseline and (final) impact assessment surveys, procurement and Financial Management (FM) training, and office and mobile equipment.
项目编号 P115954 · 入库编号 1a82b8c1e21f
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Geospatial Infrastructure and Valuation Enhancement Project (GIVE) | 2490 万美元 | 2024-05-16 |
| Sava and Drina Rivers Corridors Integrated Development Program Additional Financing | 4053 万美元 | 2023-07-25 |
| Air Quality Improvement Project | 5000 万美元 | 2023-05-30 |
| Second Employment Support Project | 4320 万美元 | 2022-07-19 |
| Health Systems Improvement Project | 7500 万美元 | 2022-04-07 |
同行业其他项目
- Food Systems Resilience Program for Eastern and Southern Africa 2022-06-21
- Sindh Flood Emergency Rehabilitation Project 2022-12-19
- Nigeria Erosion and Watershed Management Project 2012-05-08
- Transforming Irrigation Management in Nigeria 2014-06-19
- Water Sector Improvement Project 2010-06-03
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。