中项目网图形标 中项目信息网海内+海外版

Irrigation Development Project

国别:波黑行业:灌溉 阶段:已关闭 金额:4000 万美元 批准:
一句话结论

这是一个位于波黑的灌溉类海外投资项目,当前阶段为已关闭,批准金额 4000 万美元,批准日期 2012-05-03,由国际多边开发机构提供资金。项目编号 P115954。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
波黑(Bosnia and Herzegovina)
行业
灌溉
项目阶段
已关闭
批准金额
40,000,000 美元(约 4000 万美元)
批准日期
2012-05-03
项目编号
P115954
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The development objective of the Irrigation Development Project for Bosnia and Herzegovina is to improve the performance of the irrigation systems and the irrigation institutions to support agricultural producers in the project areas. There are three components to the project. The first component is infrastructure investment. This component will finance the implementation of irrigation and drainage infrastructure rehabilitation of about 12 Subprojects (SPs), of which 6 each located in Republika Srpska (RS) and Federation of Bosnia-Herzegovina (FBiH). The SPs are selected from the long-lists of potential sub-projects that were prepared by the two ministries. In FBiH this was based notably on proposals submitted by the cantons. The SPs are all located in existing agricultural land that in the past has been supplied with irrigation. In some of the SPs, the first priority will be on restoring or improving drainage. The main activities include rehabilitation with some construction, reconstruction, upgrading and modernization (only for the public/main and semi-public/secondary parts of the irrigation system, hence not on-farm), and also the introduction of new technologies that promote water use efficiency such as drip irrigation and low-pressure sprinklers. The second component is irrigation modernization. This component will support the capacity strengthening of the Ministries and Water Agencies in RS and FBiH, and participating municipalities and cantons in addressing: the new sector policies, and establishing and strengthening Water User Associations (WUAs). It will assist in developing Operations and Maintenance (O and M) arrangements for the introduced infrastructure/facilities, the fee determination, fee collection and management, and related water resources and irrigation management. The third component is project implementation support. This will cover costs of project management including Monitoring and Evaluation (M and E), safeguards, audits, Management Information System (MIS), the baseline and (final) impact assessment surveys, procurement and Financial Management (FM) training, and office and mobile equipment.

项目编号 P115954 · 入库编号 1a82b8c1e21f

同国别其他在执行项目

项目名称金额批准日期
Geospatial Infrastructure and Valuation Enhancement Project (GIVE)2490 万美元2024-05-16
Sava and Drina Rivers Corridors Integrated Development Program Additional Financing4053 万美元2023-07-25
Air Quality Improvement Project5000 万美元2023-05-30
Second Employment Support Project4320 万美元2022-07-19
Health Systems Improvement Project7500 万美元2022-04-07

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。