BD Chittagong Water Supply Improvement and Sanitation Project
一句话结论
这是一个位于孟加拉国的供水类海外投资项目,当前阶段为已关闭,批准金额 1.7 亿美元,批准日期 2010-06-23,由国际多边开发机构提供资金。项目编号 P103999。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 孟加拉国(Bangladesh)
- 行业
- 供水
- 项目阶段
- 已关闭
- 批准金额
- 170,000,000 美元(约 1.7 亿美元)
- 批准日期
- 2010-06-23
- 项目编号
- P103999
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Chittagong Water Supply Improvement and Sanitation Project for Bangladesh is to increase the sustainable access to safe water and improved sanitation, as well as support the establishment of a long term water supply, sanitation and drainage infrastructure development and operational management program in Chittagong. There are three components to the project, the first component being water supply and sanitation. This component will support the construction of Water Treatment Plants (WTPs) in Chittagong Water Supply and Sewerage Authority (CWASA's) development plan that are currently not financed or earmarked for financing by other financiers. It will also support the rehabilitation and extension of the water distribution system, including the extension of water supply and sanitation service provision to selected urban slums. The second component is the sewerage and drainage. This component will support studies to update and/or confirm the sewerage master plans and drainage master plans for Chittagong. Finally, the third component is the institutional and operational development, and project management support.
项目编号 P103999 · 入库编号 1c7ec78e7360
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Chattogram Water Supply Improvement Project | 2.8 亿美元 | 2024-12-19 |
| Health, Nutrition and Population Sector Development Program | 3.8 亿美元 | 2024-12-19 |
| Second Bangladesh Green and Climate Resilient Development Credit | 5.0 亿美元 | 2024-12-19 |
| Bay Terminal Marine Infrastructure Development Project | 6.5 亿美元 | 2024-06-28 |
| Bangladesh Second Recovery and Resilience DPC | 5.0 亿美元 | 2024-06-21 |
同行业其他项目
- Third National Program for Community Empowerment in Rural Areas (PNPM-Rural 2010-03-30
- Accelerating Reforms for an Inclusive and Resilient Recovery DPF 2 2022-03-16
- Accelerating Reforms for an Inclusive and Resilient Recovery DPF 2021-06-10
- Luanda Bita Water Supply Guarantee Project 2019-07-16
- Rural Water Supply and Sanitation Project for Low Income States 2013-12-30
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。