中项目网图形标 中项目信息网海内+海外版

Lebanon-Water Supply Augmentation Project

国别:黎巴嫩行业:供水 阶段:已关闭 金额:4.7 亿美元 批准:
一句话结论

这是一个位于黎巴嫩的供水类海外投资项目,当前阶段为已关闭,批准金额 4.7 亿美元,批准日期 2014-09-30,由国际多边开发机构提供资金。项目编号 P125184。

免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号

关键事实

国别 / 地区
黎巴嫩(Lebanon)
行业
供水
项目阶段
已关闭
批准金额
474,000,000 美元(约 4.7 亿美元)
批准日期
2014-09-30
项目编号
P125184
资金来源
国际多边开发机构
数据来源
百云数据整理入库

项目摘要

The Water Supply Augmentation Project of Lebanon has an objective to increase the volume of water available to the Greater Beirut and Mount Lebanon area. The project consists of four components. The first component will finance: (i) construction and construction supervision of the Bisri Dam and the associated access road; and (ii) construction and construction supervision of the conveyor pipelines to the existing Joun reservoir and the associated access road; two (2) hydropower plants, generating 0.2 megawatt (MW) and 12 MW respectively; and expansion of the Ouardaniyeh water treatment plant (WTP). Component two will finance priority activities, complementary to construction of Bisri dam, to ensure the long term sustainability of water service delivery across the Greater Beirut Mount Lebanon (GBML). Component 2 will finance: (i) technical assistance to the Ministry of Energy and Water (MOEW), Beirut Mount Lebanon Water Establishment (BMLWE) and Council for Development and Reconstruction (CDR) on the operation and maintenance of dams; (ii) technical assistance to the MOEW and BMLWE on management of Beirut Mount Lebanon (BML) water resources; (iii) technical assistance to Ministry of Energy and Water and Beirut Mount Lebanon Water Establishment in developing and implementing awareness raising campaigns on the economic benefits of switching to the public water network and eventual volumetric metering water supply; (iv) environment and social mitigation measures including the construction of sewerage networks in the upstream catchment villages, as described in the Environmental and Social Management Plan (ESMP). Component three will finance: (i) strengthening capacity of core Project Management Unit (PMU) within Council for Development and Reconstruction to oversee project implementation; (ii) continued engagement of the Dam Safety Panel (DSPE) as per Bank policy requirements and of the independent environment and social Panel of Experts; and (iii) supervision of the ESMP. Finally, component four will finance the costs of compensation of land acquisition of 570 hectares of land, as well as the cost of assistance for livelihood rehabilitation and monitoring of the Resettlement Action Plan (RAP) implementation.

项目编号 P125184 · 入库编号 1e7d357eb20f

同国别其他在执行项目

项目名称金额批准日期
Lebanon Renewable Energy and System Reinforcement Project2.5 亿美元2024-10-01
Community-based Wildfire Risk Management in Lebanon’s Vulnerable Landscapes—2024-08-27
Support for Social Recovery Needs of Vulnerable Groups Phase II560 万美元2024-08-27
Fiscal Management Project2850 万美元2024-02-14
Lebanon: Green Agri-food transformation for economic recovery (GATE)2.0 亿美元2023-06-28

同行业其他项目

引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。