AFR RI-3A Tanzania-Zambia Transmission Interconnector
一句话结论
这是一个位于坦桑尼亚的能源类海外投资项目,当前阶段为在执行,批准金额 4.7 亿美元,批准日期 2018-06-18,由国际多边开发机构提供资金。项目编号 P163752。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 坦桑尼亚(Tanzania)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 465,000,000 美元(约 4.7 亿美元)
- 批准日期
- 2018-06-18
- 项目编号
- P163752
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The development objective of the Transmission Interconnector Project for Tanzania is to (i) increase power transmission capacity to southern regions of Tanzania and (ii) strengthen institutional capacity in Tanzania and of the Eastern Africa Power Pool for regional power trade. This project has four component. First component, transmission infrastructure extension includes construction of approximately 620 km of 400 kV double circuit transmission lines, starting in Iringa through Kisada and Mbeya to Tunduma and continuing from Tunduma to Sumbawanga to link the Tanzanian North-West Grid to the interconnector with Zambia. This component cover the electrical and civil works, switchgear, control-protection-communication, supervisory control and data acquisition (SCADA), and auxiliary system equipment along the entire transmission route and in all substations, including required spares for transmission lines and substations. Second component, Tanzania Electric Supply Company Limited (TANESCO) transmission system readiness for interconnection and corporate commercial management improvements includes (i) a technical assessment of TANESCO’s transmission system to identify the operational, planning, and technical gaps in meeting the requirements for operational integration in the Southern African Power Pool (SAPP) and the Eastern Africa Power Pool (EAPP) to comply with the requirements for power system stability, operational ancillary enabling services, frequency synchronization, tie-line control, protection, metering, and other technical standards, and (ii) procurement and installation of necessary additional equipment and reinforcements of the generation/transmission system infrastructure to ensure that the Tanzanian grid meets all operating requirements of the interconnected networks, can synchronize with the EAPP and SAPP systems, and can engage reliably and efficiently in power trade with Zambia and Kenya and in the SAPP and EAPP markets. This component will support the integration of business systems as part of the Corporate Management System. Third component, project implementation support and capacity building will support supervision and management of Component 1 by an owner’s engineer and build TANESCO’s technical, operational, and market trading capacity to participate in regional power trade. Fourth component, technical assistance to EAPP will provide institutional strengthening and capacity building to the EAPP to establish market operating rules and platforms and set up technical requirements for operation of the EAPP member utilities (including TANESCO) in a synchronized fashion. This component financing will cover (a) institutional strengthening and capacity building to EAPP to ensure synchronized operation of grids in the power pool and for Project management; (b) support for the operationalization of centralized short-term markets to complement long-term bilateral contracts; (c) strengthening EAPP’s Independent Regulatory Board (IRB) and capacity building and knowledge sharing among the region’s regulatory boards, and (d) the establishment of a regional technical assistance facility for feasibility studies and capacity building and knowledge sharing between the region’s utilities.
项目编号 P163752 · 入库编号 2446df158d2a
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Financial Access for Sustainable and Transformational (FAST) Growth Project | — | 2024-07-30 |
| Zanzibar Judicial Modernization Project (Zi-JUMP) | — | 2024-05-10 |
| Second Tanzania Intermodal and Rail Development Project | 2.0 亿美元 | 2024-03-28 |
| Public Finance Management and Procurement Systems for Service Delivery Program | 5000 万美元 | 2024-03-21 |
| Project for Advancing Gender Equality in Tanzania (PAMOJA) | 1.0 亿美元 | 2024-03-05 |
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。