这是一个位于肯尼亚的能源类海外投资项目,当前阶段为在执行,批准金额 1.5 亿美元,批准日期 2023-12-27,由国际多边开发机构提供资金。项目编号 P180465。
免费注册智商号,开通套餐看全海外项目信息 · 年底促销 ¥299/两年(买一年送一年)
免费注册智商号关键事实
- 国别 / 地区
- 肯尼亚(Kenya)
- 行业
- 能源
- 项目阶段
- 在执行
- 批准金额
- 153,500,000 美元(约 1.5 亿美元)
- 批准日期
- 2023-12-27
- 项目编号
- P180465
- 资金来源
- 国际多边开发机构
- 数据来源
- 百云数据整理入库
项目摘要
The objective of the Second Phase of Green and Resilient Expansion of Energy Program Project for Kenya is to increase the capacity of Kenya Power System for energy trade and renewable energy integration. There are four components to the project, the first component being installation of system stabilization equipment. This component will finance installation of STATCOMs to improve the fault levels, increase voltage stability, and allow for greater import of cheaper and renewable energy from Ethiopia. One of the STATCOMs will be installed at the existing Suswa substation where the 500 HVDC Ethiopia-Kenya transmission interconnector terminates while the second STATCOM will be installed at 220/132kV Rabai substation at the coast region of Kenya. The second component is the construction of a 400kV Substation at Kimuka. The Kimuka substation will enable export of power from Ethiopia to Tanzania through Kenya by allowing the Suswa-Isinya line to be operated at full design capacity. The third component is the battery energy storage systems. Implemented by KenGen, the component will support the installation of the first BESS of up to 200MWh for load shifting renewable energy sources (primarily geothermal) but also grid stability by providing system reserves (both fast and backup reserves). The charging will occur during the off-peak period (between 10pm and 5am), while the provision of backup reserves peaks during the morning and evening hours (at 4am and 6pm). Finally, the fourth component is the technical assistance, capacity building and project management. This component includes five subcomponents: The solar auctions preparatory studies, The transaction advisory for solar auction (including legal and procurement), sector technical assistance, capacity building and project management, technical assistance to KETRACO, and technical assistance to KenGen.
项目编号 P180465 · 入库编号 465bb130438d
同国别其他在执行项目
| 项目名称 | 金额 | 批准日期 |
|---|---|---|
| Kenya Secondary Education Equity and Quality Improvement Program | 5.4 亿美元 | 2024-10-17 |
| First Kenya Fiscal Sustainability and Resilient Growth | 9.0 亿美元 | 2024-05-30 |
| Building Resilient and Responsive Health Systems | 2.0 亿美元 | 2024-03-13 |
| Kenya Water, Sanitation, and Hygiene Program | 2.5 亿美元 | 2023-12-20 |
| Kenya Jobs and Economic Transformation (KJET) Project | 1.5 亿美元 | 2023-12-11 |
同行业其他项目
- Eskom Investment Support Project 2010-04-08
- Nigeria - AF Power Sector Recovery Performance Based Operation 2023-06-09
- Additional Financing For Dasu Hydropower Stage I Project (Transmission Line) 2020-03-31
- Second Environmental Sustainability and Energy Sector Development Policy Loan 2010-06-15
- AFR RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration Program 2012-07-12
引用本条请注明:中项目信息网(cproject.net),数据由百云数据整理入库, 页面更新于 2026-11-25。